Chapter 10, Problem 10P
Summary Introduction
To determine: The number of shafts the process can turn out before the tool needs replacement.
Introduction: Quality is a measure of excellence or a state of being free from deficiencies, defects and important variations. It is obtained by consistent and strict commitment to certain standards to attain uniformity of a product to satisfy consumers’ requirement.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Specifications for a metal shaft are much wider than the machine used to make the shafts is capableof. Consequently, the decision has been made to allow the cutting tool to wear a certain amountbefore replacement. The tool wears at the rate of .004 centimeter per piece. The process has a naturalvariation, σ, of .02 centimeter and is normally distributed. Specifications are 15.0 to 15.2 centimeters.A three-sigma cushion is set at each end to minimize the risk of output outside of the specifications.How many shafts can the process turn out before tool replacement becomes necessary?
Northshore hospital surgeon, Bill, wants to build 3-sigma x- bar control limits for the open heart surgery. The target value
for the mean of the process (x-bar) is 10 units, and the standard deviation of the process is 8. If samples of size 16 are to
be taken, what will be the upper and lower control limits, respectively?
Question 33 options:
8 and 12
16 and 4
-8 and 28
18 and 6
16 and 4
Control charts for X-bar and R, using a subgroup size of 5, are to be applied to control thecritical dimension of a certain manufacturing process. Specifications call for a nominal dimension of1,250.000 + 0.050 mm. The process is believed to have a σ of 0.015 mm Determine appropriate control limits for the X-bar and R charts.
a) After 12 subgroups have been drawn and X-bar and R plotted on the charts, a computation of X-double bar give 1,250.015. b1) What is the probability that a value of X-bar will fall within the limits if this is the true value of the mean setting? b2) What is the probability that all 12values fall within the control limits?
b) Make the necessary calculations to determine if the process can meet specifications by solvingfor Cp, Cpu, CpL, Cpk . Assume a normal distribution of product output. Illustrate how the processwould look like relative to the result of the computations of the process capability analysis.
Chapter 10 Solutions
EBK OPERATIONS MANAGEMENT
Ch. 10.2 - Prob. 1.1RQCh. 10.2 - Prob. 1.2RQCh. 10.4 - Prob. 1.1RQCh. 10.4 - Prob. 1.2RQCh. 10 - Prob. 1DRQCh. 10 - Prob. 2DRQCh. 10 - Prob. 3DRQCh. 10 - Prob. 4DRQCh. 10 - Prob. 5DRQCh. 10 - Prob. 6DRQ
Ch. 10 - Prob. 7DRQCh. 10 - Prob. 8DRQCh. 10 - Prob. 9DRQCh. 10 - Prob. 10DRQCh. 10 - Prob. 11DRQCh. 10 - Prob. 12DRQCh. 10 - Prob. 13DRQCh. 10 - Prob. 14DRQCh. 10 - Prob. 15DRQCh. 10 - Prob. 16DRQCh. 10 - Prob. 1TSCh. 10 - Prob. 2TSCh. 10 - Prob. 3TSCh. 10 - Prob. 1CTECh. 10 - Prob. 2CTECh. 10 - Prob. 3CTECh. 10 - Prob. 4CTECh. 10 - Prob. 1PCh. 10 - Prob. 2PCh. 10 - Prob. 3PCh. 10 - Prob. 4PCh. 10 - Prob. 5PCh. 10 - Prob. 6PCh. 10 - Prob. 7PCh. 10 - Prob. 8PCh. 10 - Prob. 9PCh. 10 - Prob. 10PCh. 10 - Prob. 11PCh. 10 - Prob. 12PCh. 10 - Prob. 13PCh. 10 - Prob. 14PCh. 10 - Prob. 15PCh. 10 - Prob. 16PCh. 10 - Prob. 17PCh. 10 - A production process consists of a three-step...Ch. 10 - Prob. 19PCh. 10 - Prob. 20PCh. 10 - Prob. 21PCh. 10 - Prob. 22PCh. 10 - Prob. 23PCh. 10 - Prob. 24PCh. 10 - Prob. 25PCh. 10 - Prob. 26PCh. 10 - Prob. 27PCh. 10 - Prob. 28PCh. 10 - Prob. 29PCh. 10 - Prob. 1.1CQCh. 10 - Prob. 2.1CQCh. 10 - Prob. 2.2CQCh. 10 - Prob. 2.3CQCh. 10 - Prob. 2.4CQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- In process industry during a daily production run, a total of five (05) samples are collected with four (04) observations within each sample. The sample means (X-bar) are; 14.09, 13.94,16.86, 20.00, and 16.64 respectively. The corresponding ranges are; 9.90, 7.73, 4.41, 7.56, and 3.49 respectively. The lower and upper control limits of the x-bar chart are respectively O a. 11.44, 20.66 O b. 11.29, 20.65 C. None is correct Od. 11.47, 21.14 e. 11.47, 16.55arrow_forwardAuto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 10 pistons produced each day, the mean and the range of this diameter have been as follows: a) What is the value of x? = x= 155.56 mm (round your response to two decimal places). b) What is the value of R? R 4.48 mm (round your response to two decimal places). c) What are the UCL; and LCL; using 3-sigma? Day 1 2 3 4 5 Upper Control Limit (UCL) = 156.94 mm (round your response to two decimal places). Lower Control Limit (LCL-) = 154.18 mm (round your response to two decimal places). d) What are the UCLR and LCLR using 3-sigma? Upper Control Limit (UCL) = 7.96 mm (round your response to two decimal places). Mean x (mm) 154.9 153.2 155.6 155.5 158.6 Range R (mm) 4.0 4.8 3.9 5.0 4.7 Lower Control Limit (LCL) = 1.00 mm (round your response to two decimal places). e) If the true diameter mean should be 155 mm and you want…arrow_forwardThe inner diameter of piston rings follows a normal distribution with mean 75mm and variance =9. The sample size is 5, X-bar chart is established. If L =2, what is the type I error rate when process is in-control? If we change the control limits to UCL = 78.354, and LCL = 71.646, what is Type I error rate?arrow_forward
- A company producing printed circuit boards is using a c-chart with an L = 2.75 to monitor the lamination process. The process is in-control and the data show that average number of defects per inspection unit of 100 boards is 2.5. Unknowingly the process mean shifts to 4.5. What is the probability the shift will be caught on the next process sample?arrow_forwardAn automatic filling machine is used to fill 2-litres bottles of cola. The machine's output is known to be approximately Normal with a mean of 1.0 litre and a standard deviation of 011 litres. Output is monitored using means of samples of nine observations. a. Determine the upper and lower control limits that will include roughly 99.73 percent of the sample means. (Round the final answers to 3 decimal places.) litres litres Upper Control limits. Lower Control limits b. If the means for 6 samples are 1.009, .992, 995, 1.000, 1.007, and 995, is the process in control? Yes Noarrow_forwardStudies on a machine that molds plastic water pipe indicate that when it is injecting 25.76 mm diameter pipe, the process standard deviation is 0.75 mm. The pipe has a specification of 25.76 mm plus or minus 1.95 mm. What is the process capability index (Cp)? O a. 0.4333 b. 2.6 О с. 1.733 O d. 0.8667arrow_forward
- The specification limits for a product are 9.9 cm and 12.35 cm. A process that produces the product has a mean of 11.18 cm and a standard deviation of 0.52 cm. What is the process capability, Cpk? a. 0.8205 b. 1.571 c. 0.7853 d. 0.75arrow_forwardwe have seen various methods to set control limits for control charts. Which method would you prefer and why?arrow_forwardSpecifications for a part for a 3-D printer state that the part should weigh between 24 and25 ounces. The process that produces the parts has a mean of 24.5 ounces and a standard deviation of .2 ounce. The distribution of output is normal. What percentage of parts will not meet the weight specs? Within what values will 95.44 percent of the sample means of this process fall if samples of n = 16 are taken and the process is in control (random)? Using the control limits from part b, would the following sample means be in control? 24.52, 24.53, 24.44, 24.51, 24.41, 24.39 An automatic filling machine is used to fill 1-liter bottles of cola. The machine’s output is approxi- mately normal with a mean of 1.0 liter and a standard deviation of .01 liter. Output is monitored using means of samples of 25 observations. Determine upper and lower control limits that will include roughly 97 percent of the sample means when the process is in control. Given the following sample means—1.005,…arrow_forward
- Linda Boardman, I nc., an equipment manufacturerin Boston, has submitted a sample cutoff valve to improve yourmanufacturing process. Your process engineering department basconducted experiments and found that the valve has a mean (J.L)of 8.00 and a standard deviation (cr) of .04. Your desired performanceis f..L = 8.0 ±3cr, where cr = .045. What is the Cpk of theBoardman valve?arrow_forwardAn X-bar chart has the following control limits UCL=251.5 and LCL=248.5. The sample size is n=4, the process mean is equal to 250 and the process standard deviation is sigma = 1.0. What is the Cp value ? 0.500 not enough information 0.316 0.408 0.447 0.353arrow_forwardFrom the list below of the data being collected, identify which data would be appropriate for X-bar and R control charts: Select ALL correct answers. Fluid ounces in a bottle of detergent Temperature of the fryer oil at the Lay's potato chip plant Number of mistakes per article in a newspaper Percentage of flights that were not on-time for an airline Pizzas not made to order for a local pizzeria Weight of a bag of chips. Density of a golf ball Percentage of patients that had a medication error during their hospital stay SECOND PART From the list below of the data being collected, identify which data would be appropriate for a P chart: Select ALL correct answers. Fluid ounces in a bottle of detergent Temperature of the fryer oil at the Lay's potato chip plant Number of articles with mistakes per every 100 sampled at a newspaper Percentage of flights that were not on-time for an airline Pizzas not made to order for a local pizzeria…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.