Programming in C
4th Edition
ISBN: 9780321776419
Author: Stephen G. Kochan
Publisher: Addison-Wesley
expand_more
expand_more
format_list_bulleted
Question
Chapter 7, Problem 8E
Program Plan Intro
Program Plan:
- Include required header files
- Give the function prototype
- Define the main function
- Declare the variables “a”, “b”, “c”.
- Get three numbers from the user.
- Calculate the value of “res”.
- Check whether the value of “res” less than “0”.
- Print the statement.
- Otherwise, it enters into the else case if the condition fails.
- Declare the variables “x1” and “x2”.
- Call the function “squareRoot()” for “x1”.
- Call the function “squareRoot()” for “x2”.
- Print the square roots value
- Return the value “0”.
- Definition for the function “absoluteValue(float x)”
- Check “x” is less than “0”.
- Assign “-x” to x“.
- Return the value of “x”.
- Definition for the function “squareRoot(float x)”
- Declare the “epsilon” as “float”.
- Declare the variable “guess” as “float”.
- Call the function “absoluteValue()”.
- Compute the value of guess.
- Return the value of guess.
- Call the function “absoluteValue()”.
- Declare the variable “guess” as “float”.
- Declare the “epsilon” as “float”.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
38. The geometric mean g of n numbers x; is defined as the nth root of the
product of x;:
g=Vx1x2X3•…Xn
(This is useful, for example, in finding the average rate of return for an
investment which is something you'd do in engineering economics). If an
investment returns 15% the first year, 50% the second, and 30% the third year,
the average rate of return would be (1.15*1.50*1.30)") Compute this.
Computer Science
This is an introductory exercise to the manipulation of random variables with Python as a language
for scientific computing and numerical computation.
You have:
f(x) = Ae-0.1x)° 4
x*, 0
The great circle distance is the distance betweentwo points on the surface of a sphere. Let (x1, y1) and (x2, y2) be the geographicallatitude and longitude of two points. The great circle distance between the twopoints can be computed using the following formula:d = radius X arccos(sin (x1) X sin(x2) + cos(x1) X cos(x2) X cos(y1 - y2))Write a program that prompts the user to enter the latitude and longitude of twopoints on the earth in degrees and displays its great circle distance. The averageradius of the earth is 6,371.01 km. Note you need to convert the degrees into radiansusing the Math.toRadians method since the Java trigonometric methods useradians. The latitude and longitude degrees in the formula are for north and west.Use negative to indicate south and east degrees. Here is a sample run:
Enter point 1 (latitude and longitude) in degrees: 39.55 −116.25 ↵EnterEnter point 2 (latitude and longitude) in degrees: 41.5 87.37 ↵EnterThe distance between the two points is…
Chapter 7 Solutions
Programming in C
Ch. 7 - Type in and run the 17 programs presented in this...Ch. 7 - Prob. 2ECh. 7 - Modify Program 7.8 so that the value of e is...Ch. 7 - Modify Program 7.8 so that the value of g is...Ch. 7 - Prob. 6ECh. 7 - Write a function that raises an integer to a...Ch. 7 - Prob. 8ECh. 7 - The least common multiple (1cm) of two positive...Ch. 7 - Prob. 10ECh. 7 - Write a function called a that takes two...
Knowledge Booster
Similar questions
- When you borrow money to buy a house, a car, or for some other purpose, you repay the loan by making periodic payments over a certain period of time. Of course, the lending company will charge interest on the loan. Every periodic payment consists of the interest on the loan and the payment toward the principal amount. To be specific, suppose that you borrow $1,000 at an interest rate of 7.2% per year and the payments are monthly. Suppose that your monthly payment is $25. Now, the interest is 7.2% per year and the payments are monthly, so the interest rate per month is 7.2/12 = 0.6%. The first months interest on $1,000 is 1000 0.006 = 6. Because the payment is $25 and the interest for the first month is $6, the payment toward the principal amount is 25 6 = 19. This means after making the first payment, the loan amount is 1,000 19 = 981. For the second payment, the interest is calculated on $981. So the interest for the second month is 981 0.006 = 5.886, that is, approximately $5.89. This implies that the payment toward the principal is 25 5.89 = 19.11 and the remaining balance after the second payment is 981 19.11 = 961.89. This process is repeated until the loan is paid. Write a program that accepts as input the loan amount, the interest rate per year, and the monthly payment. (Enter the interest rate as a percentage. For example, if the interest rate is 7.2% per year, then enter 7.2.) The program then outputs the number of months it would take to repay the loan. (Note that if the monthly payment is less than the first months interest, then after each payment, the loan amount will increase. In this case, the program must warn the borrower that the monthly payment is too low, and with this monthly payment, the loan amount could not be repaid.)arrow_forwardThe great circle distance is the distance between two points on the surface of a sphere. Let (x1, y1) and (x2, y2) be the geographical latitude and longitude of two points. The great circle distance between the two points can be computed using the following formula: d = radius * arccos(sin(x 1) * sin(x 2) + cos(x 1) * cos(x 2) * cos(y1 - y2)) Write a program that prompts the user to enter the latitude and longitude of two points on the earth in degrees and displays its great circle distance. The average earth radius is 6,371.01 km. Note that you need to convert the degrees into radians using the math.radians function since the Python trigonometric functions use radians. The latitude and longitude degrees in the formula are for north and west. Use negative to indicate south and east degrees.arrow_forwardA year in the modern Gregorian Calendar consists of 365 days. In reality, the earth takes longer to rotate around the sun. To account for the difference in time, every 4 years, a leap year takes place. A leap year is when a year has 366 days: An extra day, February 29th. The requirements for a given year to be a leap year are: 1) The year must be divisible by 4 2) If the year is a century year (1700, 1800, etc.), the year must be evenly divisible by 400 Some example leap years are 1600, 1712, and 2016. Write a program that takes in a year and determines whether that year is a leap year. Ex: If the input is: 1712 output: 1712 is a leap year. input: 1913 output: 1913 is not a leap year. My Code: def is_leap_year(user_year):if((user_year % 4 == 0 and user_year % 100 != 0) or (user_year % 400 == 0)):print("{} is a leap year.".format(user_year))else:print("{} is not a leap year.".format(user_year))return is_leap_year if __name__ == '__main__':user_year =…arrow_forward
- A year in the modern Gregorian Calendar consists of 365 days. In reality, the earth takes longer to rotate around the sun. To account for the difference in time, every 4 years, a leap year takes place. A leap year is when a year has 366 days: An extra day, February 29th. The requirements for a given year to be a leap year are: 1) The year must be divisible by 4 2) If the year is a century year (1700, 1800, etc.), the year must be evenly divisible by 400 Some example leap years are 1600, 1712, and 2016. Write a program that takes in a year and determines whether that year is a leap year. Ex: If the input is: 1913 the output is: 1913 - not a leap year Code: is_leap_year = Falseinput_year = int(input()) 'Your code here'arrow_forwardA year in the modern Gregorian Calendar consists of 365 days. In reality, the earth takes longer to rotate around the sun. To account for the difference in time, every 4 years, a leap year takes place. A leap year is when a year has 366 days: An extra day, February 29th. The requirements for a given year to be a leap year are: 1) The year must be divisible by 4 2) If the year is a century year (1700, 1800, etc.), the year must be evenly divisible by 400 Some example leap years are 1600, 1712, and 2016. Write a program that takes in a year and determines whether that year is a leap year. Ex: If the input is 1712, the output is: 1712 - leap year Ex: If the input is 1913, the output is: 1913 - not a leap year I need answer in CC+arrow_forwardA year in the modern Gregorian Calendar consists of 365 days. In reality, the earth takes longer to rotate around the sun. To account for the difference in time, every 4 years, a leap year takes place. A leap year is when a year has 366 days: An extra day, February 29th. The requirements for a given year to be a leap year are: 1) The year must be divisible by 4 2) If the year is a century year (1700, 1800, etc.), the year must be evenly divisible by 400 Some example leap years are 1600, 1712, and 2016. Write a program that takes in a year and determines whether that year is a leap year. Ex: If the input is 1712, the output is a leap year. 1712 Ex: If the input is 1913, the output is: 1913 is not la leap year. Your program must define and call the following function. The function should return true if the input year is a leap year and false otherwise. bool IsLeapYear(int userYear) Note: This is a lab from a previous chapter that now requires the use of a function.arrow_forward
- A year in the modern Gregorian Calendar consists of 365 days. In reality, the earth takes longer to rotate around the sun. To account for the difference in time, every 4 years, a leap year takes place. A leap year is when a year has 366 days: An extra day, February 29th. The requirements for a given year to be a leap year are: 1) The year must be divisible by 4 2) If the year is a century year (1700, 1800, etc.), the year must be evenly divisible by 400 Some example leap years are 1600, 1712, and 2016. Write a program that takes in a year and determines whether that year is a leap year. Ex: If the input is: 1712 the output is: 1712 is a leap year. Ex: If the input is: 1913 the output is: 1913 is not a leap year. Your program must define and call the following function. The function should return true if the input year is a leap year and false otherwise.def is_leap_year(user_year) Note: This is a lab from a previous chapter that now requires the use of a function. def…arrow_forwardA year in the modern Gregorian Calendar consists of 365 days. In reality, the earth takes longer to rotate around the sun. To account for the difference in time, every 4 years, a leap year takes place. A leap year is when a year has 366 days: An extra day, February 29th. The requirements for a given year to be a leap year are: 1) The year must be divisible by 4 2) If the year is a century year (1700, 1800, etc.), the year must be evenly divisible by 400 Some example leap years are 1600, 1712, and 2016. Write a program that takes in a year and determines whether that year is a leap year in C++arrow_forwardA year in the modern Gregorian Calendar consists of 365 days. In reality, the earth takes longer to rotate around the sun. To account for the difference in time, every 4 years, a leap year takes place. A leap year is when a year has 366 days: An extra day, February 29th. The requirements for a given year to be a leap year are: 1) The year must be divisible by 4 2) If the year is a century year (1700, 1800, etc.), the year must be evenly divisible by 400 Some example leap years are 1600, 1712, and 2016. Write a program that takes in a year and determines whether that year is a leap year. Ex: If the input is: 1712 the output is: 1712 is a leap year. Ex: If the input is: 1913 the output is: 1913 is not a leap year. Your program must define and call the following function. The function should return True if the input year is a leap year or False otherwise.def is_leap_year(user_year)arrow_forward
- A year in the modern Gregorian Calendar consists of 365 days. In reality, the earth takes longer to rotate around the sun. To account for the difference in time, every 4 years, a leap year takes place. A leap year is when a year has 366 days: An extra day, February 29th. The requirements for a given year to be a leap year are: 1) The year must be divisible by 4 2) If the year is a century year (1700, 1800, etc.), the year must be evenly divisible by 400; therefore, both 1700 and 1800 are not leap years Some example leap years are 1600, 1712, and 2016. Write a program that takes in a year and determines whether that year is a leap year. Ex: If the input is 1712, the output is: 1712 - leap year Ex: If the input is 1913, the output is: 1913 - not a leap year #include <stdio.h> #include <stdbool.h> int main(void) { int inputYear; bool isLeapYear = false; scanf("%d", &inputYear); /* Type your code here. */ return 0; }arrow_forwardA year in the modern Gregorian Calendar consists of 365 days. In reality, the earth takes longer to rotate around the sun. To account for the difference in time, every 4 years, a leap year takes place. A leap year is when a year has 366 days: An extra day, February 29th. The requirements for a given year to be a leap year are: 1) The year must be divisible by 4 2) If the year is a century year (1700, 1800, etc.), the year must be evenly divisible by 400; therefore, both 1700 and 1800 are not leap years Some example leap years are 1600, 1712, and 2016. Write a program that takes in a year and determines whether that year is a leap year. Ex: If the input is 1712, the output is: 1712 - leap year Ex: If the input is 1913, the output is: 1913 - not a leap yeararrow_forwardA year in the modern Gregorian Calendar consists of 365 days. In reality, the earth takes longer to rotate around the sun. To account for the difference in time, every 4 years, a leap year takes place. A leap year is when a year has 366 days: An extra day, February 29th. The requirements for a given year to be a leap year are: 1) The year must be divisible by 4 2) If the year is a century year (1700, 1800, etc.), the year must be evenly divisible by 400 Some example leap years are 1600, 1712, and 2016. Write a program that takes in a year and determines whether that year is a leap year. Ex: If the input is: 1712 output: 1712 is a leap year. input: 1913 output: 1913 is not a leap year. My Code: def is_leap_year(user_year):if (user_year%4 == 0) and (user_year%100 != 0):print('{} is a leap year.'.format(user_year))elif user_year == 0:print('{} is not a leap year.'.format(user_year))elif user_year%400 == 0:print('{} is a leap year.'.format(user_year))else: print('{} is not a leap…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- C++ Programming: From Problem Analysis to Program...Computer ScienceISBN:9781337102087Author:D. S. MalikPublisher:Cengage Learning
C++ Programming: From Problem Analysis to Program...
Computer Science
ISBN:9781337102087
Author:D. S. Malik
Publisher:Cengage Learning