Practical Management Science
6th Edition
ISBN: 9781337406659
Author: WINSTON, Wayne L.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 4, Problem 119P
Summary Introduction
To determine: The way Company C can maximize the weekly profit.
Linear programming:
It is a mathematical modeling procedure were a linear function is maximized or minimized subject to certain constraints. This method is widely useful in making a quantitative analysis which is essential for making important business decisions.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
There is an upstream Picking department that feeds two downstream
Packing departments: Pack Singles and Pack Multis. Those Packing departments feed to a Shipping department that loads the outgoing trucks. 40% of your Pick volume goes to Pack Singles and has a packing rate of 104 units per labor hour (uph). 60% of the Pick volume goes to Pack Multis and has a pack rate of 215 units per labor hour. Your pickers pick both Single and Multi items throughout the day at an overall average rate of 114 units per labor hour. All units that are packed in both processes go through the Ship process at a rate of 570 units per hour. You have 102 people today for all 4 departments and you absolutely must pack 47,880 units in Pack Multis Items to meet a customer promise metric. How do you allocate labor to balance the flow in your department if you work a 10 hour shift? Do not assume breaks or lunches in your answer. Redirect 1: You now need to process all of the Pack Singles Volume in the first 5…
fi Auto mobile company manufactures cars and trucks. Each vehicle must be processed in the paint shop and body assembly shop. If the paint shop were only painting trucks, then 80 per day could be painted. If the paint shop were only painting cars, then 120 per day could be painted. If the body shop were only producing cars, then it could process 100 per day. If the body shop were only producing trucks, then it could process 100 per day. Each truck contributes GHS60,000 to profit, and each car contributes GHS40,000 to profit. Use linear programming to determine a daily production schedule that will maximize the company’s profits.
A machine part to be fabricated may be made from alloy of either of two metals. There is an order for 10,000 units. Metal A costs 3 pesos per kg, while Metal B costs 9 pesos per kg. If Metal A is used, the material per unit weighs 110 grams; for metal B, 30 grams. When metal A is used, 50 units can be produced per hour; for metal B, 80 units per hour. Metal B fabrication requires the aid of a tool costing P1,000, which will be useless after the 10,000 units are finished. The machine operator's wage is P50 per hour. If all other costs are identical, determine which material will be more economical to finish the 10,000-unit order. How much is the total cost difference between the use of metal A and metal B?
Chapter 4 Solutions
Practical Management Science
Ch. 4.2 - Prob. 1PCh. 4.2 - Prob. 2PCh. 4.2 - Prob. 3PCh. 4.2 - Prob. 4PCh. 4.2 - Prob. 5PCh. 4.2 - Prob. 6PCh. 4.3 - Prob. 7PCh. 4.3 - Prob. 8PCh. 4.3 - Prob. 9PCh. 4.3 - Prob. 10P
Ch. 4.3 - Prob. 11PCh. 4.3 - Prob. 12PCh. 4.4 - Prob. 13PCh. 4.4 - Prob. 14PCh. 4.4 - Prob. 15PCh. 4.4 - Prob. 16PCh. 4.4 - Prob. 17PCh. 4.4 - Prob. 18PCh. 4.4 - Prob. 19PCh. 4.5 - Prob. 20PCh. 4.5 - Prob. 21PCh. 4.5 - Prob. 22PCh. 4.5 - Prob. 23PCh. 4.5 - Prob. 24PCh. 4.5 - Prob. 25PCh. 4.6 - Prob. 26PCh. 4.6 - Prob. 27PCh. 4.6 - Prob. 28PCh. 4.6 - Prob. 29PCh. 4.7 - Prob. 30PCh. 4.7 - Prob. 31PCh. 4.7 - Prob. 32PCh. 4.7 - Prob. 33PCh. 4.7 - Prob. 34PCh. 4.7 - Prob. 35PCh. 4.7 - Prob. 36PCh. 4.7 - Prob. 37PCh. 4.7 - Prob. 38PCh. 4.7 - Prob. 39PCh. 4.7 - Prob. 40PCh. 4.8 - Prob. 41PCh. 4.8 - Prob. 42PCh. 4.8 - Prob. 43PCh. 4.8 - Prob. 44PCh. 4 - Prob. 45PCh. 4 - Prob. 46PCh. 4 - Prob. 47PCh. 4 - Prob. 48PCh. 4 - Prob. 49PCh. 4 - Prob. 50PCh. 4 - Prob. 51PCh. 4 - Prob. 52PCh. 4 - Prob. 53PCh. 4 - Prob. 54PCh. 4 - Prob. 55PCh. 4 - Prob. 56PCh. 4 - Prob. 57PCh. 4 - Prob. 58PCh. 4 - Prob. 59PCh. 4 - Prob. 60PCh. 4 - Prob. 61PCh. 4 - Prob. 62PCh. 4 - Prob. 63PCh. 4 - Prob. 64PCh. 4 - Prob. 65PCh. 4 - Prob. 66PCh. 4 - Prob. 67PCh. 4 - Prob. 68PCh. 4 - Prob. 69PCh. 4 - Prob. 70PCh. 4 - Prob. 71PCh. 4 - Prob. 72PCh. 4 - Prob. 73PCh. 4 - Prob. 74PCh. 4 - Prob. 75PCh. 4 - Prob. 76PCh. 4 - Prob. 77PCh. 4 - Prob. 78PCh. 4 - Prob. 79PCh. 4 - Prob. 80PCh. 4 - You want to take out a 450,000 loan on a 20-year...Ch. 4 - Prob. 82PCh. 4 - Prob. 83PCh. 4 - Prob. 84PCh. 4 - Prob. 85PCh. 4 - Prob. 86PCh. 4 - Prob. 87PCh. 4 - Prob. 88PCh. 4 - Prob. 89PCh. 4 - Prob. 90PCh. 4 - Prob. 91PCh. 4 - Prob. 92PCh. 4 - Prob. 93PCh. 4 - Prob. 94PCh. 4 - Prob. 95PCh. 4 - Prob. 96PCh. 4 - Prob. 97PCh. 4 - Prob. 98PCh. 4 - Prob. 99PCh. 4 - Prob. 100PCh. 4 - Prob. 101PCh. 4 - Prob. 102PCh. 4 - Prob. 103PCh. 4 - Prob. 104PCh. 4 - Prob. 105PCh. 4 - Prob. 106PCh. 4 - Prob. 107PCh. 4 - Prob. 108PCh. 4 - Prob. 109PCh. 4 - Prob. 110PCh. 4 - Prob. 111PCh. 4 - Prob. 112PCh. 4 - Prob. 113PCh. 4 - Prob. 114PCh. 4 - Prob. 115PCh. 4 - Prob. 116PCh. 4 - Prob. 117PCh. 4 - Prob. 118PCh. 4 - Prob. 119PCh. 4 - Prob. 120PCh. 4 - Prob. 121PCh. 4 - Prob. 122PCh. 4 - Prob. 123PCh. 4 - Prob. 124PCh. 4 - Prob. 125PCh. 4 - Prob. 126PCh. 4 - Prob. 127PCh. 4 - Prob. 128PCh. 4 - Prob. 129PCh. 4 - Prob. 130PCh. 4 - Prob. 131PCh. 4 - Prob. 132PCh. 4 - Prob. 133PCh. 4 - Prob. 134PCh. 4 - Prob. 135P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Assume the demand for a companys drug Wozac during the current year is 50,000, and assume demand will grow at 5% a year. If the company builds a plant that can produce x units of Wozac per year, it will cost 16x. Each unit of Wozac is sold for 3. Each unit of Wozac produced incurs a variable production cost of 0.20. It costs 0.40 per year to operate a unit of capacity. Determine how large a Wozac plant the company should build to maximize its expected profit over the next 10 years.arrow_forwardDuring an eight-hour shift, 750 non-defective parts are desired as a result of a manufacturing operation. The default operation time is 15 minutes. As the operators of machine are inexperienced, the actual time they take to perform the operation is 20 minutes, and, on average, a fifth of the parts that start to be manufactured are lost. Assuming that each one of the machines used in this operation will not be available for one hour in each shift, determine the number of machines needed.arrow_forwardA retail store sold in the month of April 5,000 products that produced $45,000 in sales. In the month of May the company sold 6,000 products. The store workforce consists of four full-time workers who work 40-hour week. In April the store also had seven part-time workers at 10 hours per week, and in May the store had nine part-timers at 15 hours per week (assume four weeks in each month). Using sales dollars as the measure of output (assume the price of the product was the same for both months), what is the percentage change in labor productivity from April to May? Answer: 2.arrow_forward
- 2.28 A foundry produces castings to order. An order for 20 special castings has been re- ceived. Since the casting process is highly variable, not all castings produced are good. The cost of producing each casting is $550; the additional cost of finishing a good casting is $125. If a casting is not good, it is recycled at a value of $75; excess good castings are not finished but are recycled at a value of $75. The customer has agreed to accept 15, 16, 17, 18, 19, or 20 castings at a price of $1250 each. If fewer than 15 good castings are produced, none will be purchased by the customer. Prob- ability distributions for the number of good castings produced in a batch of varying sizes are given below. How many castings should be scheduled in order to maximize expected profit? #Good Castings 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 79 2 PRODUCT, PROCESS, AND SCHEDULE DESIGN Number of Castings Scheduled 15 16 17 0.05 0.00 0.00 0.00 0.00 0.00 0.05 0.05 0.00…arrow_forwardIn order to produce 1000 units of X in a week units X is scheduled weekly for Operation B (due to 5% scrap ratio) units X is scheduled weekly for Operation A (due to 2% scrap ratio) Based on your answer in part a, find the number of machines required to produce 1000 units of X per week. The total time required to perform Operation B = minutes per week The total time required to perform Operation A = minutes per week H= Available Time in a week = minutes /week Thus FA = . FB = . Since both of the operations A and B are performed on the same machine machines are requiredarrow_forwardThe ore of a gold mine in the province contains, on average, 0,5 ounce of gold per ton Method A of processing costs 150Photon and recovers 93% of the gold, while Method B costs only 120Php/ton and recovers 81% of the gold. If gold can be sold at 1,200/ounce, which method is better and by how much?arrow_forward
- The Decision Sciences Department is trying todetermine whether to rent a slow or a fast copier. Thedepartment believes that an employee’s time is worth $15per hour. The slow copier rents for $4 per hour and it takesan employee an average of 10 minutes to complete copying(exponentially distributed). The fast copier rents for $15 perhour and it takes an employee an average of 6 minutes tocomplete copying. An average of 4 employees per hour needto use the copying machine (interarrival times areexponential). Which machine should the department rent?arrow_forward4) The making of rivet holes in structural steel members can be done by 2 methods. The first method consists of laying out the position of the holes in the members and using a drill press costing P100k. The machinist is paid P60 per hour and he can drill 80 holes per hour. The second method makes use of a multiple-punch machine costing P80k. The punch operator is paid P40 an hour and he can punch out 1 hole for 3 seconds. This method also requires an expense of P1.25 per hole to set the machine. (a) if all other costs are assumed equal, what is the total cost for each machine for 10k holes, assuming the total cost of each machine to be charged to these holes? (b) for how many holes will the costs be equal?arrow_forwardAt a small but growing airport, the local airline company is purchasing a new tractor for a tractor-trailer train to bring luggage to and from the airplanes. A new mechanized luggage system will be installed in 3 years, so the tractor will not be needed after that. However, because it will receive heavy use, so that the running and maintenance costs will increase rapidly as the tractor ages, it may still be more economical to replace the tractor after 1 or 2 years. The following table gives the total net discounted cost associated with purchasing a tractor (purchase price minus trade-in allowance, plus running and maintenance costs) at the end of year i and trading it in at the end of year j (where year O is now). i 012 1 $13,000 j 2 $28,000 $17,000 3 $48,000 $33,000 $20,000 The problem is to determine at what times (if any) the tractor should be replaced to minimize the total cost for the tractors over 3 years. (a) Formulate this problem as a minimum cost flow problem by showing the…arrow_forward
- At a small but growing airport, the local airline company is purchasing a new tractor for a tractor-trailer train to bring luggage to and from the airplanes. A new mechanized luggage system will be installed in 3 years, so the tractor will not be needed after that. However, because it will receive heavy use, so that the running and maintenance costs will increase rapidly as the tractor ages, it may still be more economical to replace the tractor after 1 or 2 years. The following table gives the total net discounted cost associated with purchasing a tractor (purchase price minus trade-in allowance, plus running and maintenance costs) at the end of year i and trading it in at the end of year j (where year O is now). i B 012 1 $13,000 j 2 $28,000 $17,000 3 $48,000 $33,000 $20,000 The problem is to determine at what times (if any) the tractor should be replaced to minimize the total cost for the tractors over 3 years. (a) Formulate this problem as a shortest-path problem by drawing a…arrow_forwardMack's guitar fabrication shop produces low cost, highly durable guitars for beginners. Typically, out of the 100 guitars that begin production each month, only 82 percent are considered good enough to sell. The other 18 percent are scrapped due to quality problems that are identified after they have completed the production process. Each guitar sells for $240. Because some of the production process is automated, each guitar only requires 10 labor hours. Each employee works an average of 160 hours per month. Labor is paid at $10 per hour, materials cost is $40 per guitar, and overhead is $3,800. Part 2 a. The labor productivity ratio for Mack's guitar fabrication shop isarrow_forwardDesign capacity is the ability of the company to produce the quantity of goods and services within a particular period of time when the company have best condition to produce and when the company have unlimited resources. These resource's includes- Men, Machinery, Material etc. It shows the maximum capacity of the company to produce. Effective capacity refers to the ability of the company to produce maximum quantity within a particular period of time to achieve in current production condition and current resources. It shows the real outcome capacity of the firm when the company produce within their own current condition of their production. Question Why is the capacity design important?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,