Chapter 11, Problem 11.20AE
Calculate missing direct material variables (Learning Objective 2)
Last month. Talley Corporation purchased and used the same quantity of material in producing its product, speed bumps for traffic control. Complete the following table.
Direct materials information | Medium speed bump | Large speed bump |
Standard pounds per unit | 15 | ? |
Standard price per pound | $ 1.00 | $ 1.80 |
Actual quantity purchased and used per unit | ? | 16 |
Actual price paid for material per pound | $ 1.80 | $2.10 |
Direct materials price variance | $1,120 U | $1,920 U |
Direct materials quantity variance | $ 100 F | ? |
Total direct material variance | ? | $ 480 U |
Number of units produced | 100 | 400 |
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Please answer parts 5-8 according to the images attached below.
Highland Company produces a lightweight backpack that is popular with college students. Standard variable costs relating to a single backpack are given below:
Standard Quantity or Hours
Standard Price or Rate
Standard Cost
Direct materials
?
$ 5.00
per yard
$ ?
Direct labor
?
?
?
Variable manufacturing overhead
?
$ 2
per direct labor-hour
?
Total standard cost per unit
$ ?
Overhead is applied to production on the basis of direct labor-hours. During March, 780 backpacks were manufactured and sold. Selected information relating to the month’s production is given below:
Materials Used
Direct Labor
Variable Manufacturing Overhead
Total standard cost allowed*
$ 15,600
$ 13,104
$ 2,496
Actual costs incurred
$ 13,112
?
$ 5,491
Materials price variance
?
Materials quantity variance
$ 790
U
Labor rate variance
?
Labor efficiency variance
?
Variable…
Quan
If an 80% learning curve is applicable, Grosse Point's total cost on this
order would be estimated at
P26,400.
P32,000.
c.. P38,000.
a.
d.
P41,800. (CMA, Adapted)
b.
A particular manufacturing job is subject to an estimated 90% learning
59.
curve. The first unit required 50 labor hours to complete. What is the
cumulative average time per unit after four units are completed?
50.0 hours
45.0 hours
40.5 hours
с.
40.0 hours
d.
a.
b.
60. Grosse Point Manufacturing recently completed and sold an order of 50
units that had costs as follows:
Direct materials
Direct labor (1,000 hours x P8.50)
Variable overhead (1,000 hours x P4.00)*
Fixed overhead
P 1,500
8,500
4,000
1,400
P15,400
Applied on the basis of direct labor hours
Applied at the rate of 10% of variable cost
If Grosse Point had experienced a 70% learning curve, the bid for the
150 units would
show a 30% reduction in the total direct labor hours required with
no learning curve.
a.
b.
include increased fixed overhead costs.
be 10%…
eleam.squ.euu.om/mod/qu12/attempt.p
learning System (Academic)
stion 3
Company XYZ uses machine hours to allocate its manufacturing overhead. The company
estimates that total machine hours to be operated next year are 190,000 hours. The estimated
variable overhead is $9 per hour and the estimated fixed overhead costs are $152,000. Calculate
wer saved
ked out of 2
the predetermined overhead rate.
lag question
Select one:
O a. $9.80
O b. $0.80
O c. $10.80
O d. $0.10
O e. None of the answers given
Clear my choice
Chapter 11 Solutions
Managerial Accounting (5th Edition)
Ch. 11 - (Learning Objective 1) Which of the following is...Ch. 11 - (Learning Objective 2) The direct material price...Ch. 11 - Prob. 3QCCh. 11 - Prob. 4QCCh. 11 - Prob. 5QCCh. 11 - (Learning Objective 4) Which of the following is...Ch. 11 - Prob. 7QCCh. 11 - (Learning Objective 6) Which of the following is...Ch. 11 - Prob. 9QCCh. 11 - (Learning Objective 7Appendix) Which of the...
Ch. 11 - Compute the standard cost of direct materials...Ch. 11 - Compute the standard cost of direct labor...Ch. 11 - Explain a direct material variance (Learning...Ch. 11 - Prob. 11.4SECh. 11 - Calculate direct material variances when the...Ch. 11 - Calculate direct labor variances (Learning...Ch. 11 - Prob. 11.7SECh. 11 - Prob. 11.8SECh. 11 - Calculate fixed overhead variances (Learning...Ch. 11 - Calculate and interpret fixed overhead variances...Ch. 11 - Prob. 11.11SECh. 11 - Calculate and interpret overhead variances...Ch. 11 - Record costing transactions (Learning Objective 7)...Ch. 11 - Record standard costing transactions (Learning...Ch. 11 - Identify ethical standards violated (Learning...Ch. 11 - Vocabulary (Learning Objectives 1, 2, 3, 4, 5, 6)...Ch. 11 - Calculate standard cost and gross profit per unit...Ch. 11 - Calculate standard cost per unit (Learning...Ch. 11 - Calculate and explain direct material variances...Ch. 11 - Calculate missing direct material variables...Ch. 11 - Calculate and explain direct labor variances...Ch. 11 - Calculate and interpret direct material and direct...Ch. 11 - Calculate the material and labor variances...Ch. 11 - Record materials and labor transactions (Learning...Ch. 11 - Calculate the standard cost of a product before...Ch. 11 - Recognize advantages and disadvantages of standard...Ch. 11 - Compute and interpret overhead variances (Learning...Ch. 11 - Data Set for E11-28A through E11-32A Country...Ch. 11 - Data Set for E11-28A through E11-32A Country...Ch. 11 - Data Set for E11-28A through E11-32A Country...Ch. 11 - Make journal entries in a standard costing system...Ch. 11 - Prepare a standard cost income statement (Learning...Ch. 11 - Calculate standard cost and gross profit per unit...Ch. 11 - Calculate the standard cost per unit (Learning...Ch. 11 - Calculate and explain direct material variances...Ch. 11 - Calculate missing direct material variables...Ch. 11 - Calculate and explain direct labor variances...Ch. 11 - Prob. 11.38BECh. 11 - Prob. 11.39BECh. 11 - Prob. 11.40BECh. 11 - Prob. 11.41BECh. 11 - Recognize advantages and disadvantages of standard...Ch. 11 - Calculate and interpret overhead variances...Ch. 11 - Prob. 11.44BECh. 11 - Prob. 11.45BECh. 11 - Prob. 11.46BECh. 11 - Prob. 11.47BECh. 11 - Prob. 11.48BECh. 11 - Prob. 11.49APCh. 11 - Comprehensive standards and variances problem...Ch. 11 - Comprehensive standards and variances problem...Ch. 11 - Prob. 11.52APCh. 11 - Prob. 11.53APCh. 11 - Prob. 11.54BPCh. 11 - Comprehensive standards and variances problem...Ch. 11 - Comprehensive standards and variances problem...Ch. 11 - Work backward through labor variances (Learning...Ch. 11 - Determine all variances and make journal entries...Ch. 11 - Calculate labor variances in a hotel (Learning...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- From your readings and videos, you learned about cost estimation using the high low method. A company has captured two sets of data to estimate maintenance cost. Using the information below, estimate total maintenance should activity level reach 8,700 machine hours. Machine Maintenance Hours Cost per Machine Hour 10,000 8,000 $0.20 $0.25 Hi Low Select one: O a, $3,450 O b. $2,450 O c. $1,000 O d. $2,000 O e. $500arrow_forwardMethod of Least Squares, Developing and Using the Cost Formula The method of least squares was used to develop a cost equation to predict the cost of receiving purchased parts at a video game manufacturer. Ninety-six data points from monthly data were used for the regression. The following computer output was received: Intercept 175,600 Slope 455 The cost driver used was number of parts inspected. Required: 1. What is the cost formula? Total cost of receiving = $ + ( $ × ) 2. Using the cost formula from Requirement 1, identify each of the following: independent variable, dependent variable, Variable rate per professional hour, and fixed cost per month. Independent variable Dependent variable Variable rate per professional hour per part inspected Fixed cost per month 3. Using the cost formula, predict the cost of receiving for a month in which 7,200 parts are inspected. Total cost of receiving = $arrow_forwardRequirement 1. Calculate the total variable costs of producing 2, 3, and 4 units assuming that Northern Defense uses an 85% incremental unit-time learning model as a basis for predicting manufacturing labor-hours. Begin by calculating the cumulative total time in labor-hours using the incremental unit-time learning model. (Round the individual unit time for Xth unit to the nearest whole number) Individual unit time for Cumulative total time: Cumulative number of units 1 2 Xth unit: Labor-hours Labor-hours 3 Data table Direct materials cost Direct manufacturing labor time for first unit Learning curve for manufacturing labor time per radar system Variable manufacturing overhead costs $ 83,000 per unit of RS-32 Direct manufacturing labor costs "Using the formula for an 85% learning curve, b= In 0.85 In 2 -0.162519 0.693147 3,900 direct manufacturing labor-hours 85% incremental unit-time" 20 per direct manufacturing labor-hour 12 per direct manufacturing labor-hour =-0.234465arrow_forward
- Assume the same information for Northern Defense as in Exercise 10-33, except that Northern Defense uses an 85% incremental unit-time learning model as a basis for predicting direct manufacturing labor-hours. (An 85% learning curve means b = -0.234465.) Q. Calculate the total variable costs of producing 2, 3, and 4 units.arrow_forwardMethod of Least Squares, Developing and Using the Cost Formula The method of least squares was used to develop a cost equation to predict the cost of receiving purchased parts at a video game manufacturer. Ninety-six data points from monthly data were used for the regression. The following computer output was received: Intercept 147,400 Slope 210 The cost driver used was number of parts inspected. Required: 1. What is the cost formula? Total cost of receiving = $ + ( $ × ) 2. Using the cost formula from Requirement 1, identify each of the following: independent variable, dependent variable, Variable rate per professional hour, and fixed cost per month. Independent variable Dependent variable Variable rate per professional hour per part inspected Fixed cost per month 3. Using the cost formula, predict the cost of receiving for a month in which 6,800 parts are inspected. Total cost of receiving = $ Identifying the Parts of the Cost Formula;…arrow_forwardPlease answer parts 1-4, I have used another question to get 5-8. Highland Company produces a lightweight backpack that is popular with college students. Standard variable costs relating to a single backpack are given below: Standard Quantity or Hours Standard Price or Rate Standard Cost Direct materials ? $ 5.00 per yard $ ? Direct labor ? ? ? Variable manufacturing overhead ? $ 2 per direct labor-hour ? Total standard cost per unit $ ? Overhead is applied to production on the basis of direct labor-hours. During March, 780 backpacks were manufactured and sold. Selected information relating to the month’s production is given below: Materials Used Direct Labor Variable Manufacturing Overhead Total standard cost allowed* $ 15,600 $ 13,104 $ 2,496 Actual costs incurred $ 13,112 ? $ 5,491 Materials price variance ? Materials quantity variance $ 790 U Labor rate variance ? Labor efficiency variance ? Variable…arrow_forward
- 20A Forecast costs at different volumes (Learning Objectives 1 & 2) Famsworth Drycleaners has capacity to clean up to 7,500 garments per month. Requirements 1. Complete the following schedule for the three volumes shown. 4,500 Garments 6,000 Garments 7,500 Garments Total variable costs $4,200 Total fixed costs Total operating costs Variable cost per garment Fxed cost per garment $2.40 Average cost per garment 2. Why does the average cost per garment change? 3. Suppose the owner, Dustin Farnsworth, erroneously uses the average cost per unit at full capacity to predict total costs at a volume of 4,500 garments. Would he overesti- mate or underestimate his total costs? By how much?arrow_forwardS Proctoring Enabled: Test 2 6 The Production Department of Hruska Corporation has submitted the following forecast of units to be produced by quarter for the upcoming fiscal year: Units to be produced Req 1 11,000 Each unit requires 0.30 direct labor-hours and direct laborers are paid $12.50 per hour. In addition, the variable manufacturing overhead rate is $2.05 per direct labor-hour. The fixed manufacturing overhead is $90,000 p quarter. The only noncash element of manufacturing overhead is depreciation, which is $30,000 per quarter. Req 2 and 3 Required: 1. Calculate the company's total estimated direct labor cost for each quarter of the upcoming fiscal year and for the year as a whole 2&3. Calculate the company's total estimated manufacturing overhead cost and the cash disbursements for manufacturing overhe for each quarter of the upcoming fiscal year and for the year as a whole. Complete this question by entering your answers in the tabs below. 10,000 Total direct labor cost…arrow_forwardRelevant Costs for Short-Ten ating income data for the year just ended: Members of the board of directors of Security Alliance have received the following oper- P8-50A Prepare and use contribution margin statements for discontinuing a ine decision (Learning Objective 4) a Security Alliance Product Line Contribution Margin Income Statement For the Year Product lines Industrial Household Systems 5. 6 Sales revenue 7 Less cost of goods sold: Variable Systems 380,000 $ Company Total 690,000 2$ 310,000 8 46,000 32,000 280,000 (2,000) $ 78,000 346,000 266,000 Fixed 9. 10 Gross profit 11 Less marketing and administrative expenses: Variable 66,000 268,000 13 14 Operating income (loss) 15 12 Fixed 63,000 37,000 (102,000) $ 69,000 23,000 176,000 $ 132,000 60,000 74,000 Members of the board are surprised that the industrial systems product line is losing money. They commission a study to determine whether the company should discontinue the line. Company accountants estimate that discontinuing the…arrow_forward
- https://education.aima.in/processOnlineExam.action?onlineAssignmentDefinition.id 1444118538- Google Chrome A education.aima.in/processOnlineExam.action?onlineAssignmentDefinition.id=1444118538 A company produces X, Y and Z from a raw material M. For every 100 tonnes ofM put into production it obtains 50 tons of product X, 30 tons of Y and 15 tons of Z, while 5 tons goes as waste. The selling price of X, Y and z is Rs. 40. Rs, 60 and Rs. 80 per ton. The cost of raw material M is Rs. 20 and variable processing costs are Rs. 10. Variable marketing costs are budgeted to be at the rate of 10 percent of sales value. Budgeted fixed overheads per annum are: Manufacturing - Rs. 40,000, Marketing - Rs. 30,000, and Administration - Rs. 20,000. The company intends to process 10,000 tonnes of material M in the coming year. or Question 21:- Fixed Cost is Rs. a) O 75000 b) O 60000 E c) 90000 d) O 55000 TH NO Question 22:- Contribution is Rs. a) O 12 per unit b) . 15 per unit F c)O 16 per unit d) O 18…arrow_forwardHighland Company produces a lightweight backpack popular with college students. Standard variable costs relating to a single backpack are given below: Standard Quantity or Hours Standard Price or Rate Standard Cost Direct materials ?question mark $ 6.00 per yard $ ?question mark Direct labor ?question mark ?question mark ?question mark Variable manufacturing overhead ?question mark $ 2 per direct labor-hour ?question mark Total standard cost per unit $ ?question mark Overhead is applied to production based on direct labor-hours. During March, 800 backpacks were manufactured and sold. Selected information relating to the month’s production is given below: Materials Used Direct Labor Variable Manufacturing Overhead Total standard cost allowed* $ 19,200 $ 9,200 $ 1,600 Actual costs incurred $ 11,100 ?question mark $ 4,740 Materials price variance ?question mark Materials quantity variance $ 3,000 U Labor rate variance ?question mark…arrow_forward10-29 Learning curve, incremental unit-time learning model. Assume the same information for Northern Defense as in Exercise 10-28, except that Northern Defense uses an 85% incremental unit-time learning model as a basis for predicting direct manufacturing labor-hours. (An 85% learning curve means b = -0.234465.) Calculate the total variable costs of producing 2, 3, and 4 units. If you solved Exercise 10-28, compare your cost predictions in the two exercises for 2 and 4 units. Why are the predictions different? How should Northern Defense decide which model it should use?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Accounting Volume 2AccountingISBN:9781947172609Author:OpenStaxPublisher:OpenStax CollegeCornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage Learning
Principles of Accounting Volume 2
Accounting
ISBN:9781947172609
Author:OpenStax
Publisher:OpenStax College
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning
What is variance analysis?; Author: Corporate finance institute;https://www.youtube.com/watch?v=SMTa1lZu7Qw;License: Standard YouTube License, CC-BY