There is an installation with two equal triphasic loads of 300 kVA each and a power factor of 0.9 lagging. When connecting a pure reactive element in parallel, the reactive power at the entrance of the installation is 150 kVARS, with a lagging power factor. We can say that: a) A bank of reactors was connected and the fp deteriorated. b) A capacitor bank was connected and the pf deteriorated. c) A bank of reactors was connected and the fp improved. d) A capacitor bank was connected and the pf improved. e) None of the above
There is an installation with two equal triphasic loads of 300 kVA each and a power factor of 0.9 lagging. When connecting a pure reactive element in parallel, the reactive power at the entrance of the installation is 150 kVARS, with a lagging power factor. We can say that: a) A bank of reactors was connected and the fp deteriorated. b) A capacitor bank was connected and the pf deteriorated. c) A bank of reactors was connected and the fp improved. d) A capacitor bank was connected and the pf improved. e) None of the above
Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter2: Fundamentals
Section: Chapter Questions
Problem 2.14MCQ: The instantaneous power absorbed by the load in a single-phase ac circuit, for a general R LC load...
Related questions
Question
There is an installation with two equal triphasic loads of 300 kVA each and a power factor of 0.9 lagging. When connecting a pure reactive element in parallel, the reactive power at the entrance of the installation is 150 kVARS, with a lagging power factor. We can say that:
a) A bank of reactors was connected and the fp deteriorated.
b) A capacitor bank was connected and the pf deteriorated.
c) A bank of reactors was connected and the fp improved.
d) A capacitor bank was connected and the pf improved.
e) None of the above
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 3 steps
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning