Quantities refers to the estimated amounts of labour and materials required in the execution of the various items of work, and together these items give the total requirements of the contract. 3.1 The concrete foundation block shown in figure 1 is excavated into shape. Calculate the net excavation quantity and the quantity of 30 MPa concrete in the block. 1.50 m 1.00 m 1.50 m 2.00 m Figure 1: Concrete Foundation Block 2.00m
Q: (1) Calculate reactions at all supports using Flexibility Method. Remove the two roller supports as…
A: SI =2Hence, taking two redundants as VB and VC.
Q: A gas is compressed under isothermal condition. The change of pressure is from 800 atm. to 803 atm.…
A: given Isothermal conditionchange in pressure=800 atm to 803 atm
Q: A concrete dam given in the figure has water 13 m deep acting on its vertical sides. The coefficient…
A:
Q: a) the distance from the mid-point of the long chord joining the P.C. and P.T. to the midpoint of…
A:
Q: 7. Fissile or foliated metamorphic rocks are mono mineral or multi minerals? 8. Which one has more…
A: Multiple choice Questions 7. foliated metamorphic rocks are monominerals 8 clay contain more water…
Q: A simply supported wood beam is reinforced with a steel plate of width b as shown in the figure. The…
A:
Q: On a railroad a -8% grade meets a +4% grade at station 2+700 whose elevation of 30.00 m. The maximum…
A: max allowable change in grade per station 20m is given 0.15 L = G2-G1γ = 0.4--0.80.15 = 8…
Q: 4-4) In hot-dip galvanisation, HDG500 (AS/NZS 2312) means (a) 500g/m²; (b) 500 years maintenance…
A: AS/NZS 2312, is guide to the protection of structural steel against atmospheric corrosion by the use…
Q: Design a column with an effective length of 22 ft to support a dead load of 65 k, a live load of 110…
A: Given:- L=22ft deadload=65klive load=110k wind load=144k To find:- select the lightest W12 of A992…
Q: 2 m 15.67 2m REZ 3 m E 2.33 -2.33 -10 -10 -12.33 -12.33 The shear diagram of a beam is shown. I m…
A:
Q: A simply supported wood beam is reinforced with a steel plate of width b as shown in the figure. The…
A:
Q: ompressible fluid was found to Cain value. Show that under the ction of the venturimeter can b
A: solution of above problem is below:
Q: Compaction test in the laboratory gave maximum dry unit weight of 18.15 kN/ m3 mo at optimum…
A: Given data- maximum dry unit weight-γd=18.15 kN/m3optimum moisture contentOMC=w=15%=0.15Specific…
Q: In a rectangular channel 12.5m wide having a bed slope of 0.0007, water flows at a uniform depth of…
A:
Q: Two designs for a beam are to be considered. Determine which one will support the loading shown…
A:
Q: A 10-cm diameter x 20 m long closed conduit pipe inclining at 45°, flowing upward full of water at a…
A: Given, D = 10 cm or 0.1 m L = 20 m P1 = 50 kPa f = 0.02
Q: A 2m B 10kN/mm 4m C 2m
A: First calculate the reaction forces at A and D. Then shear and bending moment at different locations…
Q: A solid square beam (h₁ x h₁) and a rectangular beam (b₂ x h₂; b₂<h₂, that is a narrow rectangular…
A: Since area of both rectangular and square beam are same. Area A= h1h1= b2h2 But b2 < h1 so h2 is…
Q: Explain rupture theory in detail.
A: INTRODUCTION: Rupture theory in concrete structure is also termed as flexural theory. Basically…
Q: A gravity retaining wall of top width 1 m and base width 3 m and total height of 10 m is retaining…
A:
Q: Which of the following situations are pile foundations suitable? a) dealing with foundation under…
A: Which of the following situations are pile foundations suitable? Correct answer:- (b) dealing with…
Q: 4. Which is nearest to the sun Earth or Pluto? 5. Is rock cycle in the nature opened or closed? 6.…
A: Since we only answer up to 3 sub-parts, we’ll answer the first 3. Please resubmit the question and…
Q: The acceleration due to gravity at sea level is g = 9.81 m/s2 and is decreased 0.0025 ft/s² per 1000…
A:
Q: The attached figure shows the soil sample prepared and setup for constant head permeability test. If…
A: It is given that :
Q: A slab of concrete used in highway construction is set in place when the ambient temperature is 20…
A: Given -
Q: Draw the shear - force and bending - moment diagrams for the beam shown in the figure .
A:
Q: The angle of intersection of a 5 s drawn intersecting at an angle of 60 simple curve is 50 °. From…
A: Given Data:Angle of intersection = 50°Stationing of P.T is 100+80
Q: Draw the shear and moment diagram for Beams ACD and DE that are supported at A, C, and E, and are…
A:
Q: For a proposed road alignment, visibility is restricted to 257 m only. The values of various design…
A: Solution: Given: Reaction Time (RT)=2.0sec Design Speed (V)=93km/h Grade (a)=-1.9% We know that…
Q: A T-profile beam can be oriented in the four orientations shown. For the given loading, indicate…
A: Asked: To determine which of the given possible orientations of the beam will give the least…
Q: Problem III. Solve the problem using Conjugate Beam Method. From the given fixed beam at both ends,…
A:
Q: 4 ft |←— 3 ft — Aluminum E = 10 x 106 psi W 6 ft- FIG. P2.96 6 ft Steel E = 29 × 100 psi 1.0 ft
A:
Q: 2) = e e²x (C₁ cos x + C₂sin. x) y =
A:
Q: 2/18 Determine the resultant R of the two forces applied to the bracket. Write R in terms of unit…
A:
Q: A solid steel shaft 7 m long is stressed at 88 MPa when twisted through 3º. Using G = 80 GPa,…
A: Given that : Length of shaft L= 7.0 m=7000 mm Stress τ= 88MPa Angle of twist ∅=30 =3×π180=…
Q: en the stilling basin and determine the jump efficiency?
A: Definition of stilling basin a depression in a channel or reservoir deep enough to reduce the…
Q: (a) Determine the reactions at A and E if P = 1130 N. The reactions are positive if to the right or…
A:
Q: 2/1 The force F has a magnitude of 600 N. Express F as a vector in terms of the unit vectors i and…
A:
Q: Sand layer, excavation depth of 12 m, retaining wall penetrating into the depth of 8 m below the…
A: Terzagi-Peck apparent earth pressure : For sand we have , KA=tan245-ϕ2 = tan245-302 =0.33…
Q: between A and B. a= 3.11 meters b= 1.04 meters
A: Take SG of oil =0.8Take SG of Mercury =13.2so,
Q: large exte ZURIC wwwww.yout 7. Fissile or foliated metamorphic rocks are mono mineral or multi…
A: The questions are: 7. Fissile or foliated metamorphic rocks are mono mineral or multi minerals? 8.…
Q: B BI .n N, F₁ = i N, Ft= i
A:
Q: C5-5. The 200-g projectile is fired with a velocity of 900 m/s towards the center of the 15-kg…
A: Given :
Q: For the beam and loading shown, determine the slope and deflection at the free end. The…
A: beam arrangement is given as shown in the figure above and it has been asked in the question to…
Q: 3. A pump draws water at 300 liters per second from reservoir A and lifts it to reservoir B as…
A:
Q: Q3: The following figure shows spot levels at 25 m intervals over a small site which is to be made…
A: Average level of triangle= (14.6+14.7+15+15+14.8)/5= 14.82 m Level to which it is to be increased =…
Q: • Find the shear stress in the beam using the average web shear approach. [Select] • Does the…
A:
Q: 'bd . As per IS 456:2000 for M20 grade concrete and plain barsin tension the design bond stress t=…
A:
Q: Two embankments loads on silty clay soils layers as shown below. Unit weights of the left and right…
A: Given data:- Number of embankment = 2 Unit weight of the left embankment = 11 kN/m3 Unit weight of…
Q: The sector gate UE is submerged in water as shown in the figure. The sector gate is one-twelfth of a…
A:
Step by step
Solved in 2 steps with 2 images
- In the traditional delivery method, the relationship between the contractor and designer is: Select one: O a. Contractual O b. Communicational C. All answers are correct O d. Friendship What is the total amount of excavated material in this project, given that the length is 4 m, the depth is 16 m and the width is 5.3 m. Answer: CM team should be strong in financial aspects as well as technical methods Select one: O True O False If the total quantity of concrete in a project is equal to 2500 m3, and the total price is equal to 5600 KD's, what's the unit price of concrete? Select one:Choose the lowest size and the required number of crawler hoes to excavate 828864 b-Cyd of sand & gravel in 4 months. A size one Cyd excavator (including the wage's operator) costs $80 /hr. with an increment of $5 per extra 0.5 Cyd. Depth of excavation 12 ft, Swell 25%, and efficiency 65%. Suppose the work is 8hr/day. Estimate the total expected cost.Q1: In construction of a highway section, the earthwork information is available as shown in the table below. The free-haul distance is 500m and the swelling factor is 20%. Draw the mass haul diagram between station 3 + 00 and station 9 + 00 and determine the extra compensation that must be paid to the contractor when the overhaul price is $200/m3 station. Station Cut Fill 3 + 00 50 250 4 + 00 150 550 6+ 00 150 200 7+ 00 910 50 9 + 00
- A project to move packed earth requires you to decide whether to usea dozer/scraper operation or excavator/truck operation. Determinethe most economical operation based on the dozer/scraper operationestimated at $1.25/cy. All equipment carries a rated heaped capacity, hasa fill factor of 100%, and works 45-min hours. Excavator costs $95/hr(including operator), cycle time is 0.28 min, and bucket heaped capacityis 5.0 cy. Truck costs $150/hr.(including operator), dump time is 0.5 min(maneuver, dump, turn), heaped capacity is 31.7 cy, and 12 trucks areavailable for the project.Hauling equipment operates in one directionfrom A to B to C and finally to D. Section Load Length (ft) Speed (mph) A full 3000 9B full 2500 17C empty 3000 36D empty 3000 16Topic: Quantity surveying 2.) The geometric method breaks the excavation into geometric shapes and calculates the volume for each of the shapes. true or false 3.) The data needed in estimating the roofing material are their effective widths and length in which they are available in the market. true or false 4. Because most equipment is not used on a project for an entire year, the costs must be converted to an hourly, weekly, or monthly cost. true or falseFor a task of transporting excavated materials and taking into your account following assumptions table; estimate: Needed number of trucks per day; The cost of transporting one cub meter. Track capacity 10 m3 Allowed truck speed 12 km/h Truck loading time 3.5 minutes Transportation distance 5 km Working hours per day 9 hours Daily cost of one truck 20 OMR per day Required quantity of excavation 900 m3/day
- A project to move packed earth requires you to decide whether to use a dozer/scraper operation or excavator/truck operation. Determine the most economical operation based on the dozer/scraper operation estimated at $1.25/cy. All equipment carries a rated heaped capacity, has a fill factor of 100%, and works 45-min hours. Excavator costs $95/hr (including operator), cycle time is 0.28 min, and bucket heaped capacity is 5.0 cy. Truck costs $150/hr (including operator), dump time is 0.5 min (maneuver, dump, turn), heaped capacity is 31.7 cy, and 12 trucks are available for the project. Hauling equipment operates in one direction from A to B to C and finally to D. Section ABCD Load full full empty empty Length (ft) 3,000 2,500 3,000 3,000 Speed (mph) 9 17 36 16Given the excavator information below, calculate 1) Hours required to complete 1000 CY of excavation work. 2) Cost of the operator to complete the work if his hourly wage is $35. Production Information Bucket Cycle of Operation Efficiency 3 cubic yard (CY) 40 second per cycle 45 mins per hourCalculate the cost per cubic yard to move earth for a project that plans to use a back-hoe and system of trucks. All equipment carries a rated heaped capacity, has a fill factor of 100%, and works 55-min hours. Back-hoe excavator costs are $105/hr (including operator), cycle time is 0.25 min, and bucket heaped capacity is 5.5 cy. Truck costs are $150/hr (including operator), dump time is 0.70 min (maneuver, dump, turn), heaped capacity is 32.5 cy, and 10 trucks are available for the project. Hauling equipment operates in one direction from A to B to C and finally to D according to the following table. Find the following values (note: carry out your calculations to at least 4 decimal points to obtain the best results): Section Load Length (ft) Speed (mph) full full A 2,800 2,400 2,900 2,800 в 18 empty empty 37 17
- Problem Estimate the TOTAL COST needed for Excavation, Gravel Bedding, and Concreting Works (Excavation + Cement + Gravel + Sand). Do not round off your answer. Parameters to consider: No allowance or factor of waste. Use Class AA Excavation Cost = 300 pesos per sq.m. Use 40 kgs bag Cement = 300 pesos per bag 100 mm thick gravel bed (include this in estimate) Sand = 1000 pesos per per sq.m. All footings lie on gravel bed (except FTB) Gravel = 900 pesos per per sq.m. D=1.53, I=16, and J=24 givens are in meter. What to estimate: For Earthworks: • Footing and Footing Tie Beam For Concreting Works: • Footing • Footing Tie Beam • Columns Additional: • Gravel Bed (Estimate the volume needed and include the cost in the total cost) GIVEN: A= 1530 B= 330 C= 1630 D= 1.53 E= 430 F= 480 G= 280 H= 860 I= 16 J= 24Calculate the tender rate per bank cubic meter for an excavation of a trench given:• Hire cost = R800 per hour, including owning costs• Fuel Consumption = 4 l/h of Diesel fuel at R15/h• Scoop capacity is 35 banks m3/h• Operating factor = 0.8• Dimensions of trench: 10m x 3m• Operator earns R40.41/h• Head office overheads = 30%• Site overheads = 20%• Profit margin factor = 0.045• Contractor has perceived no risk on this operationQ2: - Compute the total volume of borrow-pit by using triangle method. 1.5 L4 1.6 T1.3 1.2 1.7 1.5 1.6 1.8 14 1.2 1.9