IIn a job shop, effective capacity is only 69 percent of design capacity, and actual output is 76 percent of effective output. What design capacity would be needed to achieve an actual output of 13 jobs per week? What is its effective capacity? a. The Design Capacity needed to achieve the required actual job outputs =Blank 1 (round to whole number) b. The Effective Capacity needed to achieve the required actual job outputs = Blank 2 (round to whole number) Blank 1 Blank 2 Add your answer Add your answer
Q: Discuss the role of knowledge management in organizational capacity building.
A: Knowledge management (KM) is instrumental in enhancing organizational capacity by facilitating the…
Q: A. What are the potential consequences of not having a contingency plan in place?
A: Planning is the aspect of management that assists an individual in forecasting the future and making…
Q: Hi! I need a little help with D. I can't figure out how to calculate the efficiency. Can you explain…
A: Answer Explanation:Step 1: Step 2: Step 3: Step 4:
Q: Refer to Matrix 15.1. What is the cost to ship a 5,000 pound item in freight class 65?
A: supply chain management is manufacturing the goods and services and overseeing what is reached to…
Q: ABC Cabinets received a contract to produce bookshelf speakers (BS) and floor speakers (FS) over the…
A: operation management is that area of management that only concentrates on achieving the goal of the…
Q: Prompt 1: In the healthcare industry, everything is measured. From drip rates to dosages, it seems…
A: In the clinical benefits industry, the use of information is key for patient conception, intuitive…
Q: A component used in a manufacturing facility is ordered from an outside supplier. Because the…
A: Total cost is holding and ordering cost Holding cost after selling is inventory whatever left out…
Q: nalyze the Automobile manufacturing industry using Porter’s six forces. Write each of the six forces…
A: Porter's Six Forces Analysis is a strategic framework that assesses the competitive dynamics and…
Q: Multiple Choice: If the bakery had to produce at least one chocolate cake for every four apple pies,…
A: The issue requires characterizing a numerical limitation that precisely addresses a situation in a…
Q: What are some emergency procedures one would use in the workplace at a reposession company
A: The objective of this question is to understand the emergency procedures that should be in place in…
Q: . (BE 18-7) Myers Corp. purchased depreciable assets costing $30,000 on January 2, 2020. For tax…
A: The asset's original cost divided by its useful life yields straight-line depreciation. This is…
Q: State three (2) strengths and three (2) weaknesses of focus interviews.
A: One of the strengths of focused interviews is their ability to gather- in depth and detailed…
Q: Haji Ismail Company is going to introduce one of the three new products: keropok, satay, and chips.…
A:
Q: What is sometimes called a mass production
A: Production, at its core, is the modification of resources into useful goods or services. It's the…
Q: Discuss what are the key considerations when selecting a forecasting method for a specific industry…
A: Forecasting is a method that uses historical data to provide well-informed estimates that may be…
Q: List two (2) advantages and Two (2) disadvantages of the Observation Method of datacollection.
A: The Observation Method of data collection involves directly observing subjects in their natural…
Q: drafting the research project?
A: Creating an annotated bibliography and an outline can significantly help in achieving the goals of a…
Q: Given the time-phased work packages and network, complete the baseline budget form for the project 0…
A: Project scheduling is a process which would allocate the activity cost based on the allocation of…
Q: Memorial College is considering building a new multipurpose athletic complex on campus. The…
A: A project with 8 activities is given below:ActivityPredecessorDuration in…
Q: The desired daily output for an assembly line is 360 units. This assembly line will operate 450…
A: Let me present the given data, Task Task timeImmediate…
Q: (EOQ model with lead times and integer multiple policy): Consider the EOQ model discussed in class…
A: Find the given details: Fixed ordering cost (K), holding rate cost per unit item per unit of time…
Q: Two activities on the same critical path are candidates for crashing on a CPM network. Activity…
A: Crashing is a concept that is used to reduce the project duration so that the project can be…
Q: Alpha Sennon | Ashoka | Everyone a Changemaker Identify and discuss at least 4 Characteristics and…
A: Alpha Sennon exemplifies the traits and skill sets commonly associated with successful social…
Q: Describe transformational leadership. What are the four types of leadership behaviors that are…
A: Transformational leadership is a style of leadership where a leader works with subordinates to…
Q: The Operations Manager at the TerraCycle London Recycling Centre is currently strategizing for The…
A: Machine failure rate refers to the frequency with which a machine malfunctions or breaks down during…
Q: n the context of contemporary manufacturing strategies, how does the integration of mass…
A: A robust manufacturing strategy is critical for success in today's competitive environment.…
Q: Differentiate between exploratory and explanatory research.
A: The objective of this question is to understand the differences between exploratory and explanatory…
Q: What is the minimum cost of crashing the following project that Roger Solano manages at Slippery…
A: Find the given details below:
Q: Mueller & Associates is a urban planning firm that is designing a new public park in an Omaha…
A: Find the given details below:
Q: Given is a PERT project network diagram as shown below. Start A B C D E F H End
A: Find the given details below:
Q: The following data are for a neighboring well with an ongoing production decline: • qol 948 STB/day…
A: The formula for hyperbolic decline is given by:where:qi is the initial production rate(948…
Q: For the lincar programming problem below, using simplex method to maximize: Z= x₁ + 2x₂ + 4x₂…
A: Linear Programming Problem is given below:
Q: In the following table the activities with their precedence sequence and expected time (days) are…
A: The given question is regarding the project network diagram. The given table shows the list of…
Q: The total time taken to manufacture the first unit of Product A by Beta, Inc., was 80 hours. The…
A: Time taken to produce 1st unit = 80 hoursLearning Curve Percent = 90%
Q: Blue Lagoon is a contractor that installs residential swimming pools, projects that consist of nine…
A: Find the Given details below:
Q: Based on the sampling done, the control limits for 3-sigma x chart are (round all intermediate…
A: 3-sigma control limits, also known as three standard deviation limits, are statistical boundaries…
Q: How does organisational culture play a role to stop concerns of "quiet quitting"?
A: A calm ending emerges when experts feel drawn out, confounded, or isolated from their work or the…
Q: Assume that your stock of sales merchandise is maintained based on the forecast demand. If the…
A: The three-month moving average forecast can be determined by adding the past three month values and…
Q: The total time taken to manufacture the first unit of Product A by Beta, Inc., was 80 hours. The…
A: Time taken to produce 1st unit = 80 hoursLearning Curve Percent = 90%
Q: Thompson Photo Works purchased several new, highly sophisticated processing machines. The production…
A: The given question is regarding regression. As given in the question,x1 = Length of time an employee…
Q: ru
A: Supply Chain Management (SCM) is a critical component of modern business operations, encompassing…
Q: What role does inventory accuracy play in the effectiveness of Manufacturing Resource Planning?
A: Businesses use an integrated information system known as Manufacturing Resource Planning .The system…
Q: Midwest University is installing a high-speed intranet system. The following network shows the…
A: The shortest route problem helps to find the path that has the minimum distance, cost, or any other…
Q: How does production scheduling differ in make-to-order versus make-to-stock environments?
A: The process of deciding when things will be made in order to maximize efficiency and minimize…
Q: Describe transformational leadership. What are the four types of leadership behaviors that are…
A: Transformational leadership is a style of leadership where a leader works with subordinates to…
Q: How do organizations measure and track the effectiveness of their Quality Assurance programs?
A: The goal of quality assurance as a business idea is to provide value for customers by removing…
Q: b) Describe briefly about; i. Inventory, and Inventory cost ii. The purpose to have sales and…
A: inventory: inventory is when goods and services go through the whole process of raw material into…
Q: Discuss the impact of batch production on production costs and profitability.
A: Batch manufacturing is a method that produces a large number of comparable products at once. The…
Q: Discuss, What are the key considerations in designing and managing service delivery processes in…
A: Operation management is an aspect of management that deals with the management of the production,…
Q: Centerville Bikes and Stuff (CBS) sells motorcycles and accessories. The number of helmets sold by…
A: Answers are given below:Explanation:Answers:a) What type of pattern exists in data?Answer: The data…
Step by step
Solved in 3 steps with 1 images
- A. What is capacity? B. Why is process capacity a limiting factor in all business processes and systems? Which one isbetter: too much capacity or too little capacity? What would be the conclusiIn a job shop, effective capacity is only 43 percent of design capacity, and actual output is 71 percent of effective output. What design capacity would be needed to achieve an actual output of 11 jobs per week? What is its effective capacity?a. The Design Capacity needed to achieve the required actual job outputs = (round to whole number)b. The Effective Capacity needed to achieve the required actual job outputs = (round to whole number)a. what is the relationship between design capacity, system capacity, and actual output. b. how is a projected output within the boundaries of the design capacity and system capacity?
- er A product line includes 8 different product styles, each consisting of 93 components. Assume that 9 processing operations are needed to produce each component on average with each operation taking an average 1.2 min, which includes setup time and part handling time. All operations need a production machine, and currently 25 machines are dedicated to this task. The plant operates 52 hours per week, 52 weeks a year. Determine the yearly production of each style in units (round downward). 63 504Effective capacity is:a) the capacity a firm expects to achieve, given the currentoperating constraints.b) the percentage of design capacity actually achieved.c) the percentage of capacity actually achieved.d) actual output.e) efficiency.A process currently services an average of 42 customers per day. Observations in recent weeks show that its utilization is about 90 percent, allowing for just a 10 percent capacity cushion. If demand is expected to be 60 percent of the current level in five years and management wants to have a capacity cushion of just 4 percent, what capacity requirement should be planned? The needed capacity requirement is ____________________ customers per day. (Enter your response rounded up to the next whole number.)
- 1. Capacity refers to the productive capability of a system. What is the difference between design capacity and effective capacity? 2. What are "Utilization" and "Efficiency" in a system? Provide working formulas for these values. 3. A classroom has a design capacity of 80 seats and an effective capacity of 65 seats. If 40 students attend a class held at that location. (NoteShaper #14 & #15) What is the utilization of the classroom? What is the efficiency of the classroom?WAI is evaluating a new machine that reduces the machinetime needed for the standard corkscrew to 0.08 hour, but increasesthe machine time for the deluxe corkscrew to 0.40 hour.(a) Calculate the machine capacity needed for each period ifWAI uses the new machine.(b) Will the new machine prove benefi cial to WAI?A business company has the following capacity per month based on the following: 30 working days per month; 1 shift operation at 8 hours per shift; 30 minutes break per shift per employee ABC company produces bicycles and has the following Capacities per process. Frame Welding: 60 bikes per hour per machine Painting: 20 bikes per hour per worker Assembly: 50 bikes per hour per worker Inspection: 100 bikes per hour per worker What can be observed from the system if the demand for the month is 5,000 bikes?
- C&A Furniture uses a four-step process to make its famous wood table: Processing Time Process Milling Table top Milling Table stand Assembly Finishing The milling machine requires a setup time of 30 minutes to make table tops and a changeover time of 30 minutes to make table stands. If the batch size is 10, what is the capacity of the process in tables per minute? A) 0.077 B) 0.05 C) 0.067 10 5 15 20 D) 0.048In a job shop, effective capacity is only 50 percent of design capacity, and actual output is80 percent of effective output. What design capacity would be needed to achieve an actual output c eight jobs per week?The owner of Firewood To Go is considering buying a hydraulic wood splitter which sells for $50,000. He figures it will cost an additional $100 per cord to purchase and split wood with this machine, while he can sell each cord of split wood for $125. If, for this machine, design capacity is 50 cords per day, effective capacity is 40 cords per day, and actual output is anticipated to be 35 cords per day, what would be its utilization? 100 percent 80 percent 75 percent 70 percent 0 percent The owner of Firewood To Go is considering buying a hydraulic wood splitter which sells for $50,000. He figures it will cost an additional $100 per cord to purchase and split wood with this machine, while he can sell each cord of split wood for $125. If, for this machine, design capacity is 50 cords per day, effective capacity is 40 cords per day, and actual output is expected to be 32 cords per day, what would be its efficiency? 100 percent 80 percent 75 percent 70 percent 0 percent