3.A multi-million-dollar power plant project to provide power supply for remote communities by GRIDco was stopped by the Environmental Protection agency (EPA) citing violation of the EPA’s protocols. The EPA argues that GRIDco did not conduct environmental impact assessment (EIA) on the project within the community it is located and therefore if the project is allowed to continue, it will pose public health risk to the inhabitants within the catchment area. (a) Why is it necessary to conduct EIA on such an important project? And what will be the expected outcome of the impact assessment?
3.A multi-million-dollar power plant project to provide power supply for remote communities by GRIDco was stopped by the Environmental Protection agency (EPA) citing violation of the EPA’s protocols. The EPA argues that GRIDco did not conduct environmental impact assessment (EIA) on the project within the community it is located and therefore if the project is allowed to continue, it will pose public health risk to the inhabitants within the catchment area. (a) Why is it necessary to conduct EIA on such an important project? And what will be the expected outcome of the impact assessment?
Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter4: Transmission Line Parameters
Section: Chapter Questions
Problem BCSQ
Related questions
Question
3.A multi-million-dollar power plant project to provide power supply for
remote communities by GRIDco was stopped by the Environmental
Protection agency (EPA) citing violation of the EPA’s protocols. The EPA
argues that GRIDco did not conduct environmental impact assessment (EIA)
on the project within the community it is located and therefore if the project
is allowed to continue, it will pose public health risk to the inhabitants within
the catchment area.
(a) Why is it necessary to conduct EIA on such an important project? And
what will be the expected outcome of the impact assessment?
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning