Table 3 shows the process sequence in a production line and its related direct time study data. The production process must follow a specific route of processes A, B, C, and D respectively. Task A is in full automatic mode and requires one operator at the workstation. The worker at task B was rated with 90%, the worker at task C was rated with 115% and the worker at task D was rated with 80%. The standard allowances accepted by the company are 6% for fatigue, 5% for personal, and 4% for delay. The normal operating period is 8 hours per day and 24 days per month. Analyse the given information and determine the standard time for the product in minutes. Table 3: Average Processing Time (minutes) Job Description Average Processing Time A Automatic B Manual 40 C Manual 30 Manual 35

Elements Of Electromagnetics
7th Edition
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Sadiku, Matthew N. O.
ChapterMA: Math Assessment
Section: Chapter Questions
Problem 1.1MA
icon
Related questions
Question
Table 3 shows the process sequence in a production line and its related direct
time study data. The production process must follow a specific route of
processes A, B, C, and D respectively. Task A is in full automatic mode and
requires one operator at the workstation. The worker at task B was rated with
90%, the worker at task C was rated with 115% and the worker at task D was
rated with 80%. The standard allowances accepted by the company are 6% for
fatigue, 5% for personal, and 4% for delay. The normal operating period is 8
hours per day and 24 days per month. Analyse the given information and
determine the standard time for the product in minutes.
Table 3: Average Processing Time (minutes)
Job
Description
Average
Processing Time
A
Automatic
B
Manual
40
C
Manual
30
D
Manual
35
Transcribed Image Text:Table 3 shows the process sequence in a production line and its related direct time study data. The production process must follow a specific route of processes A, B, C, and D respectively. Task A is in full automatic mode and requires one operator at the workstation. The worker at task B was rated with 90%, the worker at task C was rated with 115% and the worker at task D was rated with 80%. The standard allowances accepted by the company are 6% for fatigue, 5% for personal, and 4% for delay. The normal operating period is 8 hours per day and 24 days per month. Analyse the given information and determine the standard time for the product in minutes. Table 3: Average Processing Time (minutes) Job Description Average Processing Time A Automatic B Manual 40 C Manual 30 D Manual 35
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Project Management Techniques
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Elements Of Electromagnetics
Elements Of Electromagnetics
Mechanical Engineering
ISBN:
9780190698614
Author:
Sadiku, Matthew N. O.
Publisher:
Oxford University Press
Mechanics of Materials (10th Edition)
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:
9780134319650
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Thermodynamics: An Engineering Approach
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:
9781259822674
Author:
Yunus A. Cengel Dr., Michael A. Boles
Publisher:
McGraw-Hill Education
Control Systems Engineering
Control Systems Engineering
Mechanical Engineering
ISBN:
9781118170519
Author:
Norman S. Nise
Publisher:
WILEY
Mechanics of Materials (MindTap Course List)
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:
9781337093347
Author:
Barry J. Goodno, James M. Gere
Publisher:
Cengage Learning
Engineering Mechanics: Statics
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:
9781118807330
Author:
James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:
WILEY