Cookie-baking project: the recipe provides the complete statement of work, from which the work breakdown structure can be developed. The resources available for this project are two cooks and one oven with limited capacity; the raw materials are the ingredients to be used in preparing the cookie dough. As listed in following table, the activities take a total of 80 minutes of resource time. Because some activities can run parallel, the cooks should complete the project in less than 80 minutes. Following table displays some of the planning that will save time in the project. For example, once the oven is turned on, it heats itself, freeing the cooks to perform other activities. After the dough is mixed, both batches of cookies can be shaped; the shaping of the second batch does not have to wait until the first batch is complete. If both cooks are available, they can divide the dough in half and each cook can shape one batch in the same four-minute period. However, if the second cook is not available at this time, the project is not delayed because shaping of the second batch need not be completed until the first batch exits the oven. Description of Activity Duration (minutes) Immediate Predecessor(s) A. Preheat oven 15 minutes B. Assemble, measure ingredients 8 minutes C. Mix dough D. Shape first batch 2 minutes B 4 minutes C E. Bake first batch 12 minutes A, D F. Cool first batch 10 minutes E G. Shape second batch 4 minutes C H. Bake second batch 12 minutes E, G I. Cool second batch J. Store cookies Total time 10 minutes H 3 minutes F, I 80 minutes Imagine the start time is 8 am, use CPM (critical path method) to plan for this task.

Algebra for College Students
10th Edition
ISBN:9781285195780
Author:Jerome E. Kaufmann, Karen L. Schwitters
Publisher:Jerome E. Kaufmann, Karen L. Schwitters
Chapter11: Systems Of Equations
Section11.CT: Test
Problem 24CT
icon
Related questions
Question
Kindly give me a detailed response
Cookie-baking project: the recipe provides the complete statement of work, from
which the work breakdown structure can be developed. The resources available for
this project are two cooks and one oven with limited capacity; the raw materials are the
ingredients to be used in preparing the cookie dough. As listed in following table, the
activities take a total of 80 minutes of resource time. Because some activities can run
parallel, the cooks should complete the project in less than 80 minutes.
Following table displays some of the planning that will save time in the project. For
example, once the oven is turned on, it heats itself, freeing the cooks to perform other
activities. After the dough is mixed, both batches of cookies can be shaped; the
shaping of the second batch does not have to wait until the first batch is complete. If
both cooks are available, they can divide the dough in half and each cook can shape
one batch in the same four-minute period. However, if the second cook is not available
at this time, the project is not delayed because shaping of the second batch need not
be completed until the first batch exits the oven.
Description of Activity
Duration (minutes) Immediate Predecessor(s)
A. Preheat oven
15 minutes
B. Assemble, measure ingredients 8 minutes
C. Mix dough
D. Shape first batch
2 minutes
B
4 minutes
C
E. Bake first batch
12 minutes
A, D
F. Cool first batch
10 minutes
E
G. Shape second batch
4 minutes
C
H. Bake second batch
12 minutes
E, G
I. Cool second batch
J. Store cookies
Total time
10 minutes
H
3 minutes
F, I
80 minutes
Imagine the start time is 8 am, use CPM (critical path method) to plan for this task.
Transcribed Image Text:Cookie-baking project: the recipe provides the complete statement of work, from which the work breakdown structure can be developed. The resources available for this project are two cooks and one oven with limited capacity; the raw materials are the ingredients to be used in preparing the cookie dough. As listed in following table, the activities take a total of 80 minutes of resource time. Because some activities can run parallel, the cooks should complete the project in less than 80 minutes. Following table displays some of the planning that will save time in the project. For example, once the oven is turned on, it heats itself, freeing the cooks to perform other activities. After the dough is mixed, both batches of cookies can be shaped; the shaping of the second batch does not have to wait until the first batch is complete. If both cooks are available, they can divide the dough in half and each cook can shape one batch in the same four-minute period. However, if the second cook is not available at this time, the project is not delayed because shaping of the second batch need not be completed until the first batch exits the oven. Description of Activity Duration (minutes) Immediate Predecessor(s) A. Preheat oven 15 minutes B. Assemble, measure ingredients 8 minutes C. Mix dough D. Shape first batch 2 minutes B 4 minutes C E. Bake first batch 12 minutes A, D F. Cool first batch 10 minutes E G. Shape second batch 4 minutes C H. Bake second batch 12 minutes E, G I. Cool second batch J. Store cookies Total time 10 minutes H 3 minutes F, I 80 minutes Imagine the start time is 8 am, use CPM (critical path method) to plan for this task.
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Recommended textbooks for you
Algebra for College Students
Algebra for College Students
Algebra
ISBN:
9781285195780
Author:
Jerome E. Kaufmann, Karen L. Schwitters
Publisher:
Cengage Learning
Glencoe Algebra 1, Student Edition, 9780079039897…
Glencoe Algebra 1, Student Edition, 9780079039897…
Algebra
ISBN:
9780079039897
Author:
Carter
Publisher:
McGraw Hill
Calculus For The Life Sciences
Calculus For The Life Sciences
Calculus
ISBN:
9780321964038
Author:
GREENWELL, Raymond N., RITCHEY, Nathan P., Lial, Margaret L.
Publisher:
Pearson Addison Wesley,
College Algebra (MindTap Course List)
College Algebra (MindTap Course List)
Algebra
ISBN:
9781305652231
Author:
R. David Gustafson, Jeff Hughes
Publisher:
Cengage Learning
Algebra & Trigonometry with Analytic Geometry
Algebra & Trigonometry with Analytic Geometry
Algebra
ISBN:
9781133382119
Author:
Swokowski
Publisher:
Cengage
Elementary Geometry for College Students
Elementary Geometry for College Students
Geometry
ISBN:
9781285195698
Author:
Daniel C. Alexander, Geralyn M. Koeberlein
Publisher:
Cengage Learning