Construct the network and find the critical path and project completion time.
Q: A water-drop of 10 μl volume is sliding on an inclined plane surface. This surface is coated with…
A: The Young-Laplace equation, which connects the wetting force to the contact angle and droplet…
Q: Q4) Consider a mechanical system that satisfies the following differential equation:…
A:
Q: Calculate the bending moment in the middle of the beam. L = 6.2 m; q = 5000 N/m and M = 4qL2
A:
Q: speed of the cart
A:
Q: How would I plot the aircraft pitch angle response to elevator step inputs of -10, and +10 degrees…
A: Using Simulink's short-period approximation, plot the aircraft pitch angle reaction to elevator step…
Q: 1. Task In the side wall of the closed tank with water (p=1000 kg/m³), there is a circular opening…
A: The first part of the question is asking for the minimum force required to open the shutter of a…
Q: A test car starts from rest on a horizontal circular track of 95-m radius and increases its speed at…
A: Given data:-The radius of circular path is The speed of car is The time taken by car is To determine…
Q: (into the page). Determine the angle required for the gate to open when necessary.
A:
Q: Consider the vectors A = 32 + 2y + 2, B = −2+ý-22 y C = â + 2y + 42 Express the following vectors in…
A:
Q: Select a crank rocker mechanism and explain it with reference to the following. Number of links and…
A: The objective of the question is to understand the crank rocker mechanism, its components, and its…
Q: The system is released from rest with the cable taut, and the homogeneous cylinder does not slip on…
A: Given:The mass of the cylinder is: The radius of the cylinder is: The angle of the slope is: The…
Q: In the mechanism shown below, link AB rotates at a constant angular velocity of 1.5 rad per sec…
A: For the solution refer below images.
Q: 4.3 An incompressible fluid flows at a rate of 0.015 m³/s through a pipe AB with a diameter of 0.1…
A: The flow rate through AB is The diameter of AB pipe is The diameter of BC is The diameter of BD is…
Q: In a brick factory, quality control is carried out according to four criteria: weight P, length L,…
A: Given:
Q: A compound shaft consists of brass segment (1) and aluminum segment (2). Segment (1) is a solid…
A: The allowable shear stress for brass shaft, The allowable shear stress for aluminum shaft, The value…
Q: Water is flowing between wedge-shaped walls into a small opening as shown in the figure below. The…
A:
Q: If the reaction temperature is too low, little reaction occurs and only a small amount of product is…
A: Given:
Q: R3-7. Determine the force in each cable needed to support the load of mass 250 kg. 0.5 m B 0.5 m N…
A: Given : The diagram is, The free body diagram is,
Q: A 27 lb. 3 ft by 3 ft square plate is loaded as shown. The force FC is 40 lbs at a = 23°. The force…
A:
Q: For the given vectors V₁ and V2, determine V₁ + V2, nondimensional. y V₂ = 11 V₁ = 13 K 3 69° 4…
A: According to the given dataThe V1 in the vector form is The V2 in the vector form is
Q: A projectile is launched from point O with the initial conditions shown. Determine the impact…
A: The x coordinate of the projectile motion is given by,x = v0(cos )ttherefore, t = x/(vocos )The y…
Q: When the effect of aerodynamic drag is included, the y-acceleration of a baseball moving vertically…
A: Here we will simple use the acceleration equation and integrate it to get height and velocity.
Q: Find the toggle position and determine the transmission angle of this system. Please use the…
A: Given:To find:Toggle position and transmission angle.
Q: A micrometer, having a ratio of reservoir to limb areas as 40, was used to determine the pressure in…
A: Given : Ratio of areas, A/a = 40 Height, h1 = 50 mm h2 = 80 mmSpecific gravity, SM =…
Q: A steam powerplant currently operates between a boiler pressure, 110 bar, and a condenser pressure,…
A:
Q: A 0.02100 m³ tank contains 1 kg of refrigerant-134a at 110°C. Determine the pressure of the…
A: In this we will use all three to get the pressure.
Q: Per cycle, engine A has a heat input of Q, a heat output of L Q2, and produces work W. Engine B has…
A: Engine A: heat input Q1 heat output Q2 work wEngine B: heat input 3Q1 heat output 2Q2…
Q: R4-5. Replace the force and couple system by an equivalent force and couple moment at point P.
A: Here we will use simple force resolve method.
Q: 4.3 An incompressible fluid flows at a rate of 0.015 m³/s through a pipe AB with a diameter of 0.1…
A: Find out(a) The flow rate in the three branches(b) The velocity in AB, BC, and BE.Giventhe flow…
Q: A flywheel with a radius of gyration 0.5 m is fitted to a multi cylinder engine, which runs at a…
A: Given k=0.5 mN=360rpmCs=0.02−(−0.04)=0.06ΔE=45kN⋅mTo FindMoment of inertia of the flywheelMass of…
Q: A compression-ignition engine with compression ratio of 14 is being designed. Pressureand…
A: The objective of the question is to calculate the pressure and temperature at the top dead centre of…
Q: Determine the maximum shear force V that the strut can support if the allowable shear stress for the…
A: Here we will use the formula for symmetric I section
Q: The working gas of a thermodynamic cycle is air. The gas originally starts at 100kPa, 1m³ and 27°C…
A:
Q: Complete the following Table (Show all work.) P T V 200 °C H₂0 R-134a H₂0 R-134a H₂0 R-134a H₂0 800…
A:
Q: A test car starts from rest on a horizontal circular track of 60-m radius and increases its speed at…
A: Given : The radius of circular path is The speed of car is The time taken by car is
Q: The 540-kg uniform beam is subjected to the three external loads shown. Compute the reactions at the…
A: Given Data
Q: 4) A spherical container is filled with iced water at 0°C. The tank is made of iron (k=15 W/m.°C)…
A: Here we will calculate equivalent resistance and use it to get heat transfer
Q: Ex/ If you know that Ехл EXX = по Мос – Еду з 30 Мра Екус-комра I Егже готра Его бо Мра, Еуго домра…
A: to find:the resultant of stresses if the normal stress is zerothe resultant of stress when a tensile…
Q: Q (2) Mohammed and Ali drive from Baqubah to Hillah with total displacement of 135.7 km (32.1° north…
A: Given- D1=135.7kmat32.1∘north of eastD2=51.9kmat25.9∘south of easttime t=1.5+1=2.5 hoursTo Find-…
Q: use an explicit scheme to solve the equation (using concentration C(x,t)). the flow velocity is…
A: Given:Advection equation:Explicit finite difference method/ scheme for the above equations i.e…
Q: LIV Air p=800 kg/m³ p=10 kg/m³ p=1600 kg/m³ A B
A: To calculate the height of the liquid columns A, B, Cthe density of mercury is density of oil is…
Q: R6-4. Determine the force in members GF, FB, and BC of the Fink truss and state if the members are…
A: Here we will use method of section to solve the problem.
Q: Convert the following physical quantities into the indicated units of measurement, 18,5米。器
A: Given data:- Physical quantity = 18.5 lb/ft3Determine:
Q: Steel disc (ID = 150mm, OD = 750mm) mounted on a solid steel sha 150mm Ini al interference in radius…
A:
Q: Determine the moment produced
A:
Q: Compressed air from the compressor of a gas turbine enters the combustion chamber at T1 = 700 K, P1…
A: Given:To find:The Mach number at the duct exit.The drop in stagnation pressure.
Q: The relation between the heat flux q", heat flow rate q, and area A normal to the direction of heat…
A:
Q: In Chapter 15, we estimated the boundary layer thickness using the integra momentum approximation.…
A: The boundary layer thickness is The wall shear stress is Also
Q: Derive the equation of motion and find the steady-state response of the system shown in Figure 3 for…
A: Given:The spring stiffness The mass of the load.The mass of the bar Here, the steady-state response…
Q: Which of the diagrams shown below represents the shear diagram for a propped cantilever beam with a…
A:
Step by step
Solved in 3 steps with 2 images
- Q1. The data shown in the table below is given for a small project: 1. Draw the network diagram (Pert Chart) for this project. 2. Identify all paths in the network. 3. Find the duration of each path. 4. Find the earliest and latest time for activities using forward and backward pass. 5. Determine the critical path. Activity Preceded by Duration (Week) 5 487 218 5 13 14 36 4 ABCDEFGHIJKLM N 0 AAAAB BC BC D,EEF HIG,K KG,L J.N.M 213. Here is a list of activity times for a project as well as crashing costs for its activities. Determine which activities should be crashed and the total cost of crashing if the goal is to shorten the proj- ect by three weeks as cheaply as possible. First construct a network diagram. You can use either an AOA or an AON (see Solved Problem 5). Path Activity Duration (weeks) First Crash Second Crash Тор A 5 $8 $10 9 C 3 14 15 Middle 3 11 7 9 3 14 15 Bottom 5 10 15 G 5 11 13 H 5 12 14Use the information below to answer the questions that follow. Annual household fuelwood use in Nigeria is 1600 kilograms The percentage of non-renewable biomass is 50% The net caloric value of woody biomass is 10 MJ/kg CO2 produced per MJ of fuelwood is 100 g 1 metric ton = 1,000,000 grams. Price of a carbon credit in California's carbon allowance auctions is $12 a) An improved firewood stove called a Mirt stove saves 25% of fuelwood in the field. Calculate the carbon savings for one year for one household (answer should be in tons of CO2). Your Answer: Answer
- Simple Machines-Levers, Inclined Planes, and Pulleys Directions: Use the appropriate equation to answer the following questions. All answers should be recorded below or in your Engineering Design journal. Remember to show all work. A lever has an effort arm that is 5 meters long and a resistance (load) arm that is 3.5 meters long. How much effort is needed to lift a 100 Newton weight? 5K i). Draw the figure representing the problem ii). How much effort is needed to lift a 100 Newton weight? iii). What is the Actual Mechanical Advantage 1. 5m i) AOON 5-5mNew York Building Corporation uses the critical path method to monitor construction jobs. The company is currently 2 weeks behind schedule on Job #181, which is subject to a P10,500 per week completion penalty. Path A-B-C-F-G-H-I has a normal completion time of 20 weeks, and critical path A-D-E-F-G-H-I has a normal completion time of 22 weeks. The following activities can be crashed. Activities Cost to Crash 1 Week Cost to Crash 2 Weeks BC P 8,000 P15,000 DE 10,000 19,600 EF 8,800 19,500 REQUIRED: 1. New York Building desires to reduce the normal completion time Job #181 and, at the same time, report the highest possible income…AMNT 280 Assignments 1-4 Media Presentation Categories Of Reciprocating Engines Develop a Media Presentation develop a power point media presentation Presentation will require researching a module specific topic For this activity you will research the four categories of reciprocating engines In your presentation address the following: 1 Research the four different types of reciprocating engines2 Provide an overview of the design, construction, and firing order of each engine 3 Provide research concerning which air frame used the engine Presentation Guidelines Note:This information applies to all Media Presentation activities and will not be repeated Present your research material in the format of a written document (Introduction, body, and conclusion) Presentation requirements consist of 5-7 slides with a balance of both bullet text information and images; does not include the title or reference slide APA formatting and structural guidelines apply Additional information…
- Use the equations for the total cost C and total revenue R to find the number x of units a company must sell to break even. (Round to the nearest whole unit.) C = 8750x + 270,000, R = 9558xI need problems 6 and 7 solved. I got it solved on 2 different occasions and it is not worded correctly. NOTE: Problem 1 is an example of how it should be answered. Below are 2 seperate links to same question asked and once again it was not answered correctly. 1. https://www.bartleby.com/questions-and-answers/it-vivch-print-reading-for-industry-228-class-date-name-review-activity-112-for-each-local-note-or-c/cadc3f7b-2c2f-4471-842b-5a84bf505857 2. https://www.bartleby.com/questions-and-answers/it-vivch-print-reading-for-industry-228-class-date-name-review-activity-112-for-each-local-note-or-c/bd5390f0-3eb6-41ff-81e2-8675809dfab1ADAMSON UNIVERSITY College of Engineering Civil Engineering Department Answer Sheet Name: Date: Course: Time: 4m 4m 100 t 200 kat
- Please solve this question in 50 mins i will give you positive feedback. Donot miss any subpart clearly mention each subpartRow indexing: Snow fall records stateSnowRecord contains the amount of snow fall (in cm) for various cities. Rows represent a city and columns represent the snow fall for a given month. Assign citySnow Record with all elements of row rowNum. Ex: If stateSnowRecord is [17.3, 20.3; 4.8, 6.2] and rowNum is 2, then citySnowRecord is [4.8, 6.2]. Function > 6 % 7 % 8 9 10 11 12 13 end function citySnowRecord = Get CitySnowFall (stateSnowRecord, rowNum) 2% Get CitySnow Fall: Returns all snow fall values for city in row rowNum % 4 % Inputs: stateSnowRecord matrix of snow fall records for cities for various months rowNum specified row of stateSnowRecord to return stateSnowRecord = [17.3, 20.3; 4.8, 6.2] Outputs: citySnowRecord - all snow fall values for a given city % Assign citySnowRecord with all elements of a row rowNum. citySnowRecord = stateSnowRecord (rowNum, :); Code to call your function > 1 GetCitySnow Fall([17.3, 20.3; 4.8, 6.2], 2) Previous Assessment: 1 of 2 Tests Passed (50%) Save…Question 2 (35 marks): A company has a project to complete. To complete the project, the following activities should be done. Draw the Project Diagram/Network (15 pts) of this project and develop a Linear Program (20 pts) for computing a critical path (NO NEED TO SOLVE IT). Duration Activity Predecessors (months) 4 A 3 B C D A 2 6 W E B, D S F E, C 7 1 G E alt H F, G 4