24: It is required to construct a road with b=10m width and 1:2 side slope. The reduced level the stations along with the existing center line as well as the designed road are given in the Use the info (table) to answer the following: ..Draw sketches for the 3 cross-sections. 2. Calculate the area of cross-section 0+00 using coordinate method. 3. Calculate the area of cross-section 0+70 using the Slopes (m and k) method. 3. Calculate the total earthwork (volume). Note: Areas+mh) (Wa+W₂) - 1

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
68
Q4: It is required to construct a road with b=10m width and 1:2 side slope. The reduced level (RL) of
the stations along with the existing center line as well as the designed road are given in the table.
Use the info (table) to answer the following:
1. Draw sketches for the 3 cross-sections.
2. Calculate the area of cross-section 0+00 using coordinate method.
3. Calculate the area of cross-section 0+70 using the Slopes (m and k) method.
4. Calculate the total earthwork (volume).
Note: Area=+mh) - (WR + W₂) - 1
.
Cross-section
0+00
Cross-section
0+70
Cross-section
1+40
#
BM1
0+0
0+0
0+0
RL of
CL
36
34.98
35.19
34.98
0+70 34.47
0+70
0+70
1+40
1+40
1+40
BM2
34.21
33.79
33.76
34
34.03
34.46
DIST
egesgege
4R
O CL
41
4R
O CL
4L
4R
OCL
4L
Designed
road
34.5
34.5
34.5
34.57
34.57
34.57
34.64
34.64
34.64
Cut
Fill
Description
BM1
Area = ?
Area = ?
Area = ?
BM2
Transcribed Image Text:68 Q4: It is required to construct a road with b=10m width and 1:2 side slope. The reduced level (RL) of the stations along with the existing center line as well as the designed road are given in the table. Use the info (table) to answer the following: 1. Draw sketches for the 3 cross-sections. 2. Calculate the area of cross-section 0+00 using coordinate method. 3. Calculate the area of cross-section 0+70 using the Slopes (m and k) method. 4. Calculate the total earthwork (volume). Note: Area=+mh) - (WR + W₂) - 1 . Cross-section 0+00 Cross-section 0+70 Cross-section 1+40 # BM1 0+0 0+0 0+0 RL of CL 36 34.98 35.19 34.98 0+70 34.47 0+70 0+70 1+40 1+40 1+40 BM2 34.21 33.79 33.76 34 34.03 34.46 DIST egesgege 4R O CL 41 4R O CL 4L 4R OCL 4L Designed road 34.5 34.5 34.5 34.57 34.57 34.57 34.64 34.64 34.64 Cut Fill Description BM1 Area = ? Area = ? Area = ? BM2
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Site plan requirements
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning